Question
Book Icon
Chapter 4, Problem 8P
To determine

Ascertain the estimated cost at completion of project and variance for each cost.

Blurred answer
Students have asked these similar questions
8. A contractor has a contract to construct the sanitary sewer, water line, storm drain, and street lighting for a new subdivision. The contractor uses the cost codes in Figure 2-6. The original estimate for the sewer was $25,000, and a $3,200 change order has been approved to add a manhole. The sewer work has been completed by the contractor at a cost of $27,365. The original estimate for the waterline was $31,000, and no changes have been made to the budget. The costs to date for the waterline are $31,300 and it is estimated that it will take another $450 to complete the waterline. The water line is being installed by the contractor. The original estimate for the storm drain was $17,000, and no changes have been made to the budget. The contractor has paid $7,236 for materials and estimates that it will cost $9,764 to install the storm drain. The contractor will install the storm drain. The original estimate for the outside lighting was $23,600, and no changes have been made to the…
residential client hired a general contractor (GC) to construct a major $3 million executive home. The client contracted separately with a reputable architect for the design. After the permit was obtained, the architect’s contract was closed out. During the course of construction, the owner and the city had requested several changes, but none of them were formalized into the contract. Many of these were additive but some were also deductive changes. Many of the changes were due to building code changes. Because the general contractor understood this to be a time and materials (T&M) project, they had not felt it was necessary to submit change orders against a “budgeted” amount. The GC had previously invoiced and received 67% of the original budget, or $2 million, from the owner. These invoices were all reviewed and approved by the lender. At approximately 90% completion, the GC invoiced the owner for the full 100% amount of the original $3 million estimate. When pressed, the GC…
Jax Construction Company plans to erect a new building. It will use part of the space for its own offices and lease the balance of the space to tenants. The company has two alternatives: (1) do its own construction work or (2) use an independent contractor. Cost estimates have been prepared to show the costs of operation for the coming year during which the new building will be constructed. The costs of constructing the building, if done by Jax, are included in that set of estimates. If the company does its own construction work, it will not be able to handle outside construction contracts that would contribute $500,000 to net income. The costs attributable to these outside contracts are excluded from the estimated costs of operation shown below.   Estimated Costs toOperate –Construction byIndependentContractors Estimated Costs toOperate (includingConstruction) –Construction by Jax(self) Materials $6,000,000  $7,000,000 Labour  3,000,000 4,800,000 Indirect materials and…
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
CONCEPTS IN FED.TAX., 2020-W/ACCESS
Accounting
ISBN:9780357110362
Author:Murphy
Publisher:CENGAGE L