Concept explainers
a
Interpretation:
Mean and standard deviation if the sample.
Concept Introduction: Mean is the average of all the samples collected. It is usually the sum of all samples divided by the number of samples. Standard deviation is the difference between each sample from the sample mean. It clarifies how much is the deviation of the sample from its mean.
a
Explanation of Solution
Number of | ||
Sample | Red Candy | |
1 | 10 | 50 |
2 | 12 | 50 |
3 | 11 | 50 |
4 | 10 | 50 |
5 | 8 | 50 |
6 | 13 | 50 |
7 | 11 | 50 |
8 | 9 | 50 |
Total | 84 | 400 |
b
Interpretation:
Upper control limit and lower control limit.
Concept Introduction: Control charts are the graphical representation to check or monitor the variations of the process and length of deviations from average.
b
Explanation of Solution
Calculation of p-bar:
Value of p-bar = 0.21
Calculation of upper control limit and lower control limit:
c
Interpretation:
Upper control limit and lower control limit when number of candies vary.
Concept Introduction: Control charts are the graphical representation to check or monitor the variations of the process and length of deviations from average.
c
Explanation of Solution
Calculation of c-bar:
Calculation of upper control limit and lower control limit:
In part b, upper control value and lower control value are defined for a limited sample in which sample size will fit properly due to less deviation from the mean. However, in part c, upper control value and lower control value have large space which leads to the maximum number of samples to fit in. Sample in part c are more versatile.
Want to see more full solutions like this?
Chapter 13 Solutions
Practical Operations Management
- Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.)1 9.700 0.044 7 9.703 0.0212 9.700 0.051 8 9.707 0.0583 9.689 0.042 9 9.695 0.0394 9.706 0.037 10…arrow_forwardThe IRS is concerned with improving the accuracy of tax information given by its representatives over the telephone. Previous studies involved asking a set of 25 questions of a large number of IRS telephone representatives to determine the proportion of correct responses. Historically, the averageproportion of correct responses has been 72 percent. Recently, IRS representatives have been receiving more training. On April 26, the set of 25 tax questions were again asked of 20 randomly selected IRS telephone representatives. The numbers of correct answers were 18, 16, 19, 21, 20, 16,21, 16, 17, 10, 25, 18, 25, 16, 20, 15, 23, 19, 21, and 19. a. What are the upper and lower control limits for the appropriate p-chart for the IRS? Use z = 3. b. Is the tax information process in statistical control?arrow_forwardTwelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 9.602 0.033 7 9.603 0.041 2 9.602 0.041 8 9.605 0.034 3 9.593 0.034 9 9.597 0.027 4 9.606 0.051 10 9.601 0.029 5 9.599 0.031 11 9.603 0.039 6 9.599 0.036 12 9.606 0.047 Part 2 For the given data, the x double overbarx = (inches (round your response to four decimal places)arrow_forward
- Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 9.602 0.033 7 9.603 0.041 2 9.602 0.041 8 9.605 0.034 3 9.593 0.034 9 9.597 0.027 4 9.606 0.051 10 9.601 0.029 5 9.599 0.031 11 9.603 0.039 6 9.599 0.036 12 9.606 0.047 Part 2 For the given data, the x double overbarx = 9.6013 inches (round your response to four decimal places). Part 3 Based on the sampling done, the control limits for 3-sigma x overbarx chart are: Upper Control Limit (UCL Subscript x…arrow_forwardAuto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 5 pistons produced each day, the mean and the range of this diameter have been as follows: Day Mean (mm) Range R (mm) 158 4.3 151.2 4.4 155.7 4.2 153.5 4.8 156.6 4.5 What is the UCL using 3-sigma?(round your response to two decimal places). 1. 2. 4.arrow_forwardTwelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 13.502 0.033 7 13.501 0.041 2 13.500 0.041 8 13.507 0.034 3 13.489 0.034 9 13.493 0.027 4 13.508 0.051 10 13.501 0.029 5 13.497 0.031 11 13.501 0.039 6 13.499 0.036 12 13.506 0.047 For the given data, the x = nothing inches (round your response to four decimal places). Based on the sampling done, the control limits for 3-sigma x chart are: Upper Control Limit (UCLx) = nothing inches (round your response…arrow_forward
- Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 10.802 0.044 7 10.803 0.021 2 10.800 0.051 8 10.807 0.058 3 10.791 0.042 9 10.793 0.039 4 10.808 0.037 10 10.803 0.038 5 10.797 0.048 11 10.803 0.054 6 10.801 0.053 12 10.806 0.061 Part 2 For the given data, the x = enter your response here inches (round your response to four decimal places).arrow_forwardTwelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean(in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 9.402 0.033 7 9.401 0.041 2 9.404 0.041 8 9.407 0.034 3 9.391 0.034 9 9.393 0.027 4 9.406 0.051 10 9.401 0.029 5 9.397 0.031 11 9.403 0.039 6 9.399 0.036 12 9.404 0.047 Part 2 For the given data, the x = enter your response here inches (round your response to four decimal places).arrow_forwardAt Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its length is between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49 inches and a standard deviation of 0.014 inches.arrow_forward
- Organic Grains LLC uses statistical process control to ensure that its health-conscious, low-fat, multigrain sandwich loaves have the proper weight. Based on a previously stable and in-control process, the control limits of the x- and R-charts are: UCL-4.86, LCL- = 4.52, UCLR=1.344, LCLR = 0. Over the past few days, they have taken five random samples of four loaves each and have found the following: Based on the x-chart, is one or more samples beyond the control limits? Sample 1 2 3 4 5 Yes No Loaf # 1 4.8 4.4 4.5 4.6 5.0 Net Weight Loaf # 2 4.7 4.8 4.5 4.9 4.8 Loaf # 3 5.0 4.7 4.9 4.7 4.7 Loaf # 4 4.7 4.8 4.6 4.5 4.6arrow_forwardDesigning an x -Chart Using the Process Standard DeviationThe Sunny Dale Bank monitors the time required to serve customers at the drive-through window because it is an important quality factor in competing with other banks in the city. After analyzing the data gathered in an extensive study of the window operation, bank management determined that the mean time to process a customer at the peak demand period is 5 minutes, with a standard deviation of 1.5 minutes. Management wants to monitor the mean time to process a customer by periodically using a sample size of six customers. Assume that the process variability is in statistical control. Design an x-chart that has a type I error of 5 percent. That is, set the control limits so that there is a 2.5 percent chance a sample result will fall below the LCL and a 2.5 percent chance that a sample result will fall above the UCL. After several weeks of sampling, two successive samples came in at 3.70 and 3.68 minutes, respectively. Is the…arrow_forwardDevelop a p chart with 3 sigma control limits and evaluate whether the process is in statical controlarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.