Part 2: Analysis and selection of the Wind Turbine. The team decides at install a 30 MW wind farm. The turbine that has been selected by the local contractor is an Enercon wind turbine. The specifications of all the available Enercon wind turbine is shown in the attached datasheet. The wind turbine will be installed in a wooded area, full of trees. The data from the Meteorological office says that the wind speed at a height of 10 m in the selected area is: 8.25 m/s. This is to be used as the design speed. 1. If the average wind speed at the turbine height is expected to be 6.0 m/s (IEC Class IIIA) over the full year, calculate the expected energy that would be produced by this wind farm in one year.
Part 2: Analysis and selection of the Wind Turbine. The team decides at install a 30 MW wind farm. The turbine that has been selected by the local contractor is an Enercon wind turbine. The specifications of all the available Enercon wind turbine is shown in the attached datasheet. The wind turbine will be installed in a wooded area, full of trees. The data from the Meteorological office says that the wind speed at a height of 10 m in the selected area is: 8.25 m/s. This is to be used as the design speed. 1. If the average wind speed at the turbine height is expected to be 6.0 m/s (IEC Class IIIA) over the full year, calculate the expected energy that would be produced by this wind farm in one year.
Chapter7: Relays
Section: Chapter Questions
Problem 9SQ: What is optoisolation?
Related questions
Question
Part 2: Analysis and selection of the Wind Turbine.
The team decides at install a 30 MW wind farm. The turbine that has been selected by the local contractor is an Enercon wind turbine. The specifications of all the available Enercon wind turbine is shown in the attached datasheet.
The wind turbine will be installed in a wooded area, full of trees. The data from the Meteorological office says that the wind speed at a height of 10 m in the selected area is: 8.25 m/s. This is to be used as the design speed.
1. If the average wind speed at the turbine height is expected to be 6.0 m/s (IEC Class IIIA) over the full year, calculate the expected energy that would be produced by this wind farm in one year.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you