In the next figure.we want to fill the two tanks with water by a pump. The pump is operating manually by a push-button "Start". When the first tank becomes full, the circuit should automatically start to fill the second tank by closing the first valve, and opening the second valve, and when the second tank is full, the pump disconnects automatically and a "sign lamp" is turned on to show that 2nd tank is full. Start/Stop Contact Station Float Switch 1 Float Switch 2 Electrically Operated Valve
In the next figure.we want to fill the two tanks with water by a pump. The pump is operating manually by a push-button "Start". When the first tank becomes full, the circuit should automatically start to fill the second tank by closing the first valve, and opening the second valve, and when the second tank is full, the pump disconnects automatically and a "sign lamp" is turned on to show that 2nd tank is full. Start/Stop Contact Station Float Switch 1 Float Switch 2 Electrically Operated Valve
Chapter3: Magnetic Starters
Section: Chapter Questions
Problem 23SQ
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 1 images
Recommended textbooks for you
Electricity for Refrigeration, Heating, and Air C…
Mechanical Engineering
ISBN:
9781337399128
Author:
Russell E. Smith
Publisher:
Cengage Learning
Electricity for Refrigeration, Heating, and Air C…
Mechanical Engineering
ISBN:
9781337399128
Author:
Russell E. Smith
Publisher:
Cengage Learning