Q: Question 3 The rigid structure BCD is supported as shown. Assume a = 6.7 ft, b = 4.8 ft, c = 3.0 ft,...
A: Given data, a = 6.7 ft b = 4.8 ft c = 3.0 ft d = 1.8 ft Angle = 30° FOS = 1.9 To find out the all...
Q: Use Slope-Deflection Method or Moment Distribution Method to solve for the unknowns on the 120mm x 2...
A:
Q: A) Which emerging transportation modes are likely to reduce VMT in low density suburban areas, and w...
A: Given questions A) Which emerging transportation modes are likely to reduce VMT in low density subur...
Q: Compute the intensities of active and passive earth pressure at depth of 6 m in dry cohesionless san...
A: Given that, H = 6m φ = 30°, Unit weight of the sand, Y = 18kN / m³ Find Active and passive Earth...
Q: For the beam shown, draw shear and moment diagrams: 20 kN 10 kN A 4m 2m 1m
A:
Q: In what type of building code article would you see a statement describing in detail the nailing req...
A: QUE:- in what type of building code article would you see a statement describing in detail the naili...
Q: Degree of curve, DA = 2° 00' 00", STA @ BC = 21+33.04 (feet) Determine the radius of the curve (feet...
A: Given : circular curve with degree of curve = 2 degrees STA@BC = 21+33.04 (feet)
Q: At-rest: A 17-ft-high basement wall retains a backfill with y= 95 pcf, o' = 33°, c' 0 and OCR = 1.8....
A: We are required to calculate: magnitude of the lateral thrust acting per unit length of the wall lo...
Q: The 5-day BOD of a wastewater sample is obtained as 190 mg/l (with k = 0.01 h1). The ultimate oxygen...
A:
Q: 3. (a) Determine the shear force and bending moment as functions of x. (b) Draw the shear force and ...
A: Appreciate if there is detailed work with explanation and finds you helpful for ease of understandin...
Q: Homework 2: Find the best hydraulic section for trapezoidal channel section (last time to receive th...
A:
Q: For a given soil sample it has a sp.gr. of 2.74, moisture content of 16.6% and a moist unit weight o...
A: The answer is found to be Porosity =33.33% For explanation please refer the attached solution, thank...
Q: the Moment Capacity of the se the flexural stress at fiber 30 m
A:
Q: For an eccentrically loaded continuous foundation on sand, given B = 2.35 m, Df = 1.78 m, e/B = 0.17...
A:
Q: The square footing shown in the figure carries a load of 3500 kN. Assume that the stress below the f...
A: We have to determine the value of settlement of the clay layer as per the given data in the question...
Q: In your own words, What can you say about the traffic situation in the Philippines. Identify the fac...
A:
Q: Wo A
A:
Q: 6. A C8X11.5 single channel section is bolted to a gusset plate with M22 bolts. Assume A572 Gr.50 st...
A:
Q: Determine the slope and displacement at point B
A:
Q: PROBLEM: Design a rectangular beam for a 10 m span to support a dead load of 15 kN/m (not including ...
A:
Q: What document is required for facilities before they discharge treated wastewater into bodies of wat...
A:
Q: The linkage is made of two pin-connected A-36 steel members, each having a cross-sectional area of 2...
A: Given -
Q: A 3m deep sand layer has a specific gravity of 2.68 and a void ratioof 0.60. Under this layer is a 2...
A: Compression index of clay Cc=e0-e1logp1p0 where e0 and e1 are initial and final voids ratio and p0...
Q: TRUE or FALSE 1. The wetted perimeter of a closed-conduit flow is lesser than an open- channel flow ...
A: 1. False 2.True
Q: What is the most common cause of noise in internal detectors
A:
Q: A car hits a tree at an estimated 38mph on a 4% downgrade. If skid marks are observed for a distance...
A: Given -
Q: 3 m 1.5 m Draw The Moment diagram for the beam
A: Given -
Q: Question 3 The rigid structure BCD is supported as shown. Assume a = 6.7 ft, b = 4.8 ft, c = 3.0 ft,...
A: Given data, a = 6.7 ft b = 4.8 ft c = 3 ft d =1.8 ft Theta = 30° Pin A, B, C diameter = 0.625 in Ul...
Q: A gravity earth dam 2 m width across the top and a height of 4.5m is to be constructed with side slo...
A: An earth dam is a wall of compacted earth made to form a retaining structure behind which water can ...
Q: An 8 meter long horizontal beam is supported the left end by a fixed support and supported to the ri...
A:
Q: ILLUSTRATE AN ISOLATED SQUARE FOOTING SHOWING A PLAN(TOPVIEW) AND AN ELEVATION(FRONT VIEW) WITH ITS ...
A: In a Square footing the column Bars are extended in the footing till anchorage length Ld in order t...
Q: A car hits a tree at an estimated 38mph on a 4% downgrade. If skid marks are observed for a distance...
A:
Q: A sandy soil has a total unit weight of 120 pcf, a specific gravity of solids of 2.64, and a water c...
A:
Q: Given a cantilever beam with given loadings and cross-section as shown in the figures, what is the s...
A:
Q: nydraulic conductivity of the sand layer is 1.65 m/day. the quantity of water which flows into the d...
A: Elevation Diference between two point At upstream evation = 175m At downstream elevation = 130m Hyd...
Q: 4. The composite bar is initially stress-free. Calculate the stress in each material and indicate te...
A: Given in the question: Length of Steel bar Ls = 400mm Length of Aluminum bar La = 500mm Length of br...
Q: 250 300 250 100 200 175 75 600
A:
Q: The rigid structure BCD is supported as shown. Assume a = 6.7 ft, b = 4.8 ft, c = 3.0 ft, d = 1.8 ft...
A: Given Data -
Q: A dam is triangular in cross-section with the upstream face vertical. Water is flushed with the top....
A:
Q: A simple way to model air pollution over a city is using a box model that assumes complete mixing an...
A:
Q: A-36 steel has a modulus of elasticity of 250 GPa and Poisson ratio of v = 0.30. Determine the shear...
A:
Q: PROBLEM No. 2 The rigid bar ABCD of negligible weight is initially horizontal, and the steel rods at...
A: E=29*106 psi to find displacement at Aand C
Q: A 2 ft В
A: Given data -
Q: Solve Prob. 9–54 using Castigliano's theorem. 12 k 5 ft 5 ft Be Inc 900 in.* LAB= 600 in. 12 ft IcD ...
A:
Q: 150 250 125
A:
Q: Problem Number 2: The Frame is hinged at rigid supports in A & E. Find the components of the Reactio...
A: To reaction at A and E.
Q: Answer is letter B
A: Given data- Diameter(D) = 8in Height (H) = 16in Youngs modulus (E) = 2.5× 10^6 lb/in² Unit deformati...
Q: The A-36 steel rod has a diameter of 60 mm and is firmly attached to the rigid supports at A and B w...
A:
Q: The hgure shows a granular soil in a tank having a downward seepage. The water level in the tank is ...
A:
Q: A beam has a lenght of L = 8 m long and carrying the uniformly distributed load of w = 5 kN/m. w kN/...
A:
Hi! can you please help me with this? I'm stuck because we need to provide explanation and I don't know how to explain. Thank you in advance!
Q: How much concrete do you need to fill 1800 sq. ft. of space?
Step by step
Solved in 2 steps with 1 images
- List at least four types of information that should be documented in the Daily Construction Report.Background You are the project manager for a construction project that involves building a new office building. Your team has identified the following tasks that need to be completed, along with their estimated durations: • Clear and grade the site (2 weeks) • Obtain necessary permits (3 weeks) Lay foundation (4 weeks) • Install plumbing and electrical systems (6 weeks) Complete landscaping (2 weeks) • Construct the building shell (10 weeks) • Finish interior (8 weeks) Install exterior finishes (4 weeks) Your Task 1. Using the information above, create a project activities network that illustrates the dependencies and sequence of these tasks. Consider the following questions: o Are the activities in the correct order? o What are the relationships between these activities? 2. Submit your project activities network below. Once you have submitted your response, the next page will be unlocked with a model answer. 3. Review your classmates' responses. Are they the same as yours? Are there…For a project that will be staffed by a Resident Project Representative, two inspectors, and a field clerk, what is the minimum size recommended for the field office trailer?
- Please provide a complete solution for letter d. and use the correct method for verification purposes. Thank you for the assistance.You are a site engineer and you have non workable concrete that is needed to be casted. In your opinion, what is the best action that you will take to solve that problem ? Please give me proper answer... Note: this is not an assignment questionDraw simple FBD and submit the solution within 25 minutes, Urgent.
- Describe any Five major construction methods which are advance, innovative and sustainable process or techniques to be involved in during the construction stage of this project (covers site investigation, site planning and development, earthwork and excavation, temporary works, concrete handling and curing, lightweight materials inconstruction, etc.).if you have a delivery of 255 m3 of concrete how many samples do you have?Show your complete solution and drawing the diagram. Need ASAP. Thank you.