Estimating & Costing Civil Q Create a rough estimate for the building project with the total Based on the statistics below, the total building's plinth area is 800 square metres. i) Plinth area fee is Rs. 4500 per square metre Water supply costs are 7% of building costs. Cost of electrical and sanitary installations, each at 7% of the price of iv) The price of architectural features is 1% of the cost of the structure. v) The cost of streets and lawns, which is 5% of building costs. vi) P&S and contingency costs at 4% of building costs. Calculate the project's overall cost.

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter16: Budget Estimating
Section: Chapter Questions
Problem 2RQ
icon
Related questions
Question

Estimating & Costing Civil Q Create a rough estimate for the building project with the total

Based on the statistics below, the total building's plinth area is 800 square metres.

i) Plinth area fee is Rs. 4500 per square metre

Water supply costs are 7% of building costs.

Cost of electrical and sanitary installations, each at 7% of the price of

iv) The price of architectural features is 1% of the cost of the structure.

v) The cost of streets and lawns, which is 5% of building costs. vi) P&S and contingency costs at 4% of building costs.

Calculate the project's overall cost. 

Expert Solution
steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Knowledge Booster
Estimating construction costs
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,