Discuss the method of safety measures taken during constriction of a multistoryed building in a congested place.
Q: How did the architect and his design team, and the construction team solved or attended to the above…
A: During design phase: Its done based on axisymmetric conditions which is quite tough to analyse…
Q: . When blower door test is performed, the air leakage rate of the structure is determined by…
A: When the blower door test is performed, the air leakage rate of the structure is determined by…
Q: Discuss at at least 3 preventive measures of specific electrical hazards found in an office…
A: There are 3 preventive measures of specific electrical hazards found in an office construction as…
Q: How to write literature review on a comparitative research on hydraulic hose failures?
A: A hydraulic hose is primarily made to transport hydraulic fluid from or to hydraulic devices,…
Q: Identify the Occupancy Category of the structure using the NSCP 2015 provisions, and explain your…
A: Solution : The building to be categorised is a 9 story university building in Baguio City . Here ,…
Q: What is the minimum dimension of septic tank in residential building?
A:
Q: Estimate the needed fire flow rate and volume required to provide adequate protection to 2-Story…
A: Given data: Effective floor area = 1200 sq. m Area of floor (A) = 1200 m2 For a two-story joisted…
Q: Find the grade resistance, to the nearest ten pounds, for a 2400-lb car traveling on a -2.4°…
A:
Q: some practical examples of all the sewer appurtenance.
A: The materials and accessories used in the seewage system for smooth operation of the system is known…
Q: discuss all the necessary emergency response measures in retrieving an injured personnel inside the…
A: Sewer Sewer is a term used to describe a section of the sewerage system, which is the…
Q: The minimum number of plumbing facilities required for an auditorium planned for a total 0f 5,500…
A:
Q: List and describe possible effects of overpumping a well.
A:
Q: On a six-storey building refurbishment project involving partial demolition and structural…
A: Strategy for Demolition Security: The location, as well as the property or construction to be…
Q: boat push nets allowed to operate in municipal waters
A: Municipal water is also known as tap water, it is the water that we receive in our homes. The…
Q: building? How should you exit the ECE building when the fire alarm sounds? What should you do if you…
A: ANS 55 1. Run In the event that you can securely get away, do as such. Move out of the building and…
Q: Outline the steps in determining Main Wind-Force Resisting Systems (MWFRS) wind loads for enclosed,…
A: Wind Load Design MWFRS Directional Procedure: 1) Consider a general case for buildings of all…
Q: When a vehicle that is presented for inspection will not fit in the building because it is too tall,…
A: A sticker obtained from either the Department of Motor Vehicles through an authorized inspection…
Q: Write an environmental impact assessment for a new dam construction
A: Environmental impact assessment is a research or a study in which assessment is done about the…
Q: Provide the sanitary waste pipe size if the pipe is carrying 400 fixture units and sloped at 1/8”…
A: Here, in the given problem we are only provided with the following data-- 1. SANITARY waste 2.…
Q: Analyze the construction of the duct system including insulations, methods of duct design and the…
A: Ducts There are various type of modern design which is used as a part of ventilation in the…
Q: Enumerate and discuss 6 hazards of dealing with fire related emergencies and discuss mitigating…
A: Hi! Thank you for the question As per the honor code, We’ll answer the first question since the…
Q: What does “Refusal” mean during SPT Test?
A: Brief concept- SPT test- This test is done on the soil to check the soil for bearing capacity,…
Q: list the strategic concerns associated with fire in row frame buildings
A: Row framed buildings are those which are built in rows that may contain as many as 20 or more…
Q: TEST ON PVC SEWER PIPELINE
A: Pressure Pipe:Constant Pressure Test (CPT) or Water loss method This particular test can be used for…
Q: A shopping center is being designed for a location in Chicago. The building will be located in a…
A: Roof snow load would be completely depandent on the snow fall intensity of that perticular area. In…
Q: Define the load transfer mechanism for paving blocks in pedestrian footway?
A: Answer:- Pedestrian footway: Footway means a footpath, lane or other place solely use of pedestrias…
Q: Determine the flat roof snow load for a building located in Niagara Falls, NY using ASCE 7 and the…
A:
Q: During inspections of bridges, the critical inspection findings can either be structural or safety…
A: Brief concept- Bridges- A bridge is a horizontally spanning structure that carries vertical loads…
Q: Problem 1 – A large unheated storage/warehouse structure with an asymmetric gable roof system (as…
A: Given A symmetric low Slope gable roof system =150ft wide And elevation =3650ft Consider the free…
Q: Question regarding Environment science & engineering There are faulty parts found in the primary…
A: Unlike other plants, wastewater treatment plant also use many mechanical parts and devices for its…
Q: How do you respond to a flashflood that is fast approaching in your area? A have a plan to protect…
A: (E) is the correct answer. Flash Floods are sudden floods that are caused due to number of events.…
Q: Give a summary of the Skyline Towers collapse in Arlington, Virginia, 1973
A: HISTORY: The construction of skyscrapers plaza started in early 1970-ies. The site was located south…
Q: a) Discuss how shockwaves are formed and how their occurrence can be reduced or mitigated? b)List…
A: a)Structure of Shock Waves This is created while a pressure front travels at supersonic speeds and…
Q: Opaque elements in the building envelope exclude: Select one: a. Windows and skylights b. Roof and…
A: Given data Elements of building Opaque material
Q: 1. Explain the importance of having a well-drafted plumbing layout. 2. What is the…
A: There are different types of components which are used to develop the plumbing system. Thus we need…
Q: What are the three basic steps in an Air Quality Assessment?
A:
Q: What are criteria and non-criteria pollutants? What do you understand from a term Micro Indoor Air…
A:
Q: Draw a free body diagram of a typical flagpole with flag attached.
A: The free body diagram of a typical flagpole with flag attached is shown below-
Q: When fall arrest equipment is used, employers must assure that O All equipment is properly inspected…
A: When fall arrest equipment is used employers must assure that All equipment is properly inspected…
Q: Question: A construction company having 02 floors height & around 15 rooms , occupied by around…
A:
Q: Sprinkler protection must be provided for exterior balconies in an apartment building of which…
A: Building : A building is a permanent construction that is generally roofed and walled. Rudimentary…
Q: For a conceptual design, you are being asked to provide a preliminary design of the new school…
A: Design column: A segment is characterized as an underlying part exposed to compressive power toward…
Q: Q-4) List the Nine different environmental loads that a building shall be designed for to resist as…
A:
Q: Why is it recommended to ensure the coinciding of the center of mass of the floor with the center of…
A: When designing a lateral load resisting system, it is advised to ensure that the centre of mass of…
Q: In safety engineering discuss, The different causes why a worker hesitates to wear PPE. Show the…
A: Safety engineering is a branch of engineering that ensures that engineered systems deliver…
Step by step
Solved in 2 steps
- A concrete structure with a minimum dimension of 150 mm, concrete cover of 30 mm, and rebar spacing of 40 mm clear. Determine between size 19 and 25 mm can be suitable for this structure. Select the correct response: 19 mm 25 mm Both 19 and 25 mm Neither 19 nor 25mmComparison of Timber and Steel formwork for a bridge Comparison of Timber and Steel formwork for a residential building Precautions while installing different members of formwork Potential causes of failure Recommendations for a high rise building.Outline what penetration testing involves when assessing and remediating avulnerability.
- How is ground acceleration related to the seismic design of the building?Please show complete solution with complete FBD thank youUse ASCE 7-10 tables of structural discontinuity and identify the type of structural irregularity (if any) for the following buildings. For each case, if any irregularity is found, suggest a method to modify the building and eliminate that irregularity. (Suggest practical solutions and respect the architectural intent.)
- WHAT IS THE NSCP MODULUS RUPTURE FORMULA?With reference to the NSCP 2015, choose the correct statement: For design of reinforced concrete columns, the amount of vertical bar: Select the correct response: 0.75 0.65 0.85 0.90 ( Previous Continue >In an aperment complex, there are 5 windows in each apartment, and 9 apartments in each floor. How many windows are there on 8 floors?
- Find the grade resistance, to the nearest ten pounds, for a 2100-lb car traveling on a 1.8° uphill grade.Single choice question : 8. Which of the following statements about the setting of seismic joints is incorrect (A)When the structure type of both sides is the same, the width of the seismic joint should be determined by the height of the lower houses on both sides(B)When the house height on both sides is the same, the width of the seismic joint should be determined by the structure type of a larger seismic joint as required(C)The width of the seismic joints is independent of the structural type of the house(D)The width of the seismic joints is related to the height of the house48- Mr. Mazin is a franchise owner of McDonald's. Which type of store structure is suitable for his business? a. Photo made structure b. Oval structure c. Prototype structure d. Modular structure