A 12-kW, 240-volt range contributes _____ watts to the load when calculating the service by the standard method
Q: Explain this diagram for dummy
A: The given circuit is as shown below,
Q: What is the lighting demand load before derating for a house with outside dimensions of 30ft x 48ft…
A: Here, we have given the outside dimensions of a house. For the first floor the dimension is : 30…
Q: Can I use the 66-block in telephone wire distribution to its outlets? How is it distributed?
A: According to the question, we need to explain the 66-block in telephone wire distribution.
Q: What is the load for 100 15A/20A, 125v duplex receptacles in a non-dwelling occupancy after applying…
A: NEC Table 220.44 gives demand factor for Non Dwelling receptacle.
Q: In your own words and from your own understanding, avoid plagiarism or copying from the Course…
A: Power system requires transmission of power from generation end to the consumer end. The power…
Q: 1. Circuit breakers should be included in the impedance diagram. (True/False)
A: SINGAL LINE DIAGRAM OF A POWER SYSTEM: A single line diagram is the representation of a power system…
Q: A residential service entrance load calculation is required to correctly size which of the…
A:
Q: Hello please I need the wiring diagram of a three phase transmission line system
A: The wiring diagram of a three phase transmission line system: The need for three-phase supply or…
Q: What is the purpose of plenum-rated cabling?
A: In this question of we will write purpose of plenum rated cabling...
Q: (i) Explain the major components of a high voltage transmission lines with suitable diagram. Label…
A: The bulk transportation of electrical energy from a generating station to a substation is known as…
Q: Explain the power transmission and distribution system through diagram
A: An electric power system is a network of electrical components used to supply, transmit and use…
Q: write down the factors considered for selection of conductor for overhead LT distribution line.…
A: There are various factors need to be check before selecting conductor for over head transmission…
Q: The minimum size raceway for the following branch circuit conductors is: Twelve, 6 AWG conductors…
A: The transmission of power from one place to another is very necessary, usually, the voltage level of…
Q: 1-DO you need a repeater station if we used optical cable under the sea level? And why?
A: If we used optical cable under sea level then there is a chance that it lose or reduce its signal.…
Q: A 15-ampere, 120-volt lighting branch circuit would be 12 amperes maximum connected load. true or…
A: Since generally loading can not be more than 125% of maximum load, so we can load this system upto…
Q: () List any three factors to be considered for mechanical design of overhead lines
A: According to our expert policy only one individual question is to answered.kindlybrepost the…
Q: 7. What is the object of equipment grounding? Briefl y describe the functions of substation…
A: The object of equipment grounding: To reduce as much as possible the emergence of any voltages in…
Q: differentiate between overhead service connection and under ground service connection with sketch
A: Overhead Service Connection:- Electric locomotives, trolleybuses, and trams receive their electrical…
Q: the complex power delivered to the load
A:
Q: Real power and voltage magnitude are the quantities specified for ................... bus.
A:
Q: Which of the following is not a criteria for the mechanical design of an overhead line? O Minimum…
A: over head lines are designed based on distance between conductor and earth , tensile stress ,…
Q: QUESTION 5 a) What is the difference between neutral and earth? b) Differentiate between…
A: In a three phase system, there are two ways to connect a three phase load. Star/Wye Connection.…
Q: 1. What is the proper size copper grounding electrode conductor for a 100-ampere service that…
A: Given-Rating of service conductor=100 ASize of phase conductor= 3/0 AWG
Q: The floating power supply is a method for anti-interference in which neither of the conductors is…
A: The floating power supply is nothing but neither of the conductors is connected to the line carrying…
Q: If asked to determine the power rating (MVA rating) of an overhead line, do they mean the power…
A: The power rating of a transmission line is defined at the designing phase of the line. Power carried…
Q: The PTs are to be connected delta-wye, to monitor the voltage of a 250 kV line, PTs are to be…
A:
Q: hat is the receptacle demand load for a 9600 square foot office building with 52 receptacles
A: As per the regulation of national electrical code, a minimum requirement of 180VA must be used for…
Q: The line described is 845 mi in length.The line contains four conductors, each weighing 2526 lb per…
A: since 1 mi = 5280 ft so 845 mi = 845×5280 = 4461600 ft so the length of the line =…
Q: In an overhead system, the basis of comparison is the maximum voltage between conductor and ground.…
A: An overhead power line is a structure that transmits electrical energy across long distances in…
Q: Enumerate and discuss the standard criteria to be considered when designing overhead pole lines to…
A: Overhead Transmission line- Overhead Transmission line is define as cables which are used to conduct…
Q: How many conductor volume allowances should be applied for the equipment grounding conductors in the…
A: We need to answer how many conductor volume allowances should be applied for the equipment grounding…
Q: analyse the rating of wires/ cables and mcb used for different types of loads
A: A small circuit breaker called an MCB is used to trip when home appliances experience overcurrent…
Q: 4. Why are the outer metal parts of electrical appliances grounded?
A:
Q: Which of the following criteria is correct for the mechanical design of the overhead line? Minimum…
A: Design parameters of design mechanical design of the overhead line.
Q: Determine the percent voltage drop along a 480V, three-phase feeder, 100m in length, consisting of…
A: It is given that: V=480 VI=300∠-30° Ωl=100 m
Q: (i) Explain the major components of a high voltage transmission lines with suitable diagram. Label…
A: We’ll answer the first question since the exact one wasn’t specified. Please submit a new question…
Q: . A grounded circuit conductor and the equipment grounding conductor should always be joined at the…
A: Choose the correct option A grounded circuit conductor and the equipment grounding conductor should…
Q: Explain how electricty power is generated and tramnsimitted to customer unit. Show The single line…
A: The electrical power is generated and transmitted to the consumer : The electrical power is…
Q: Identify the parts of the wind power system shown.
A: To identify the parts of a wind power systems
Q: list the material required for overhead service connection
A: Various Types of Electrical service connections - Overhead Underground Majorly overhead is…
Q: Draw clearly, neatly, and properly the Circuit Schematic Diagram for a SINGLE BUSBAR SYSTEM with BUS…
A: Draw clearly, neatly, and properly the Circuit Schematic Diagram for a SINGLE BUSBAR SYSTEM with BUS…
Q: 310.12 re: Single-phase dwelling services-feeders YOUR TURN # 21-A: What size service conductors are…
A: Here we need to determine the size of service conductors, which are required if the calculated load…
Q: . What is “accessible” as applied to wiring methods? What is “accessible” as applied to equipment?…
A: In an electrical system, there are various terms which are used for different phenomenon and gives a…
Q: Explain the working of LVDT with neat diagram.
A: LVDT : LVDT is divice which translates linear motion into electrical signal
Q: (i) List any three factors to be considered for mechanical design of overhead lines
A: List of the factor to be design overhead transmission line
Q: The house department of Government plants to undertake four housing projects and lists material…
A: Given parameters are: 6800 gallons of paint. 1420000 cubic feet of wood. 64 million bricks. 448000…
Q: Which of the following criteria is correct for the electrical design of the overhead line? O Tensile…
A: Need to find the criteria for Electrical design of overhead line
Q: A 4.5-kVA, 240 volt electric clothes dryer contributes _____ amperes to the neutral load , when…
A:
Q: Airframe Electrical System Question: Which wire installation type has the best rating and is the…
A: The wire installation type with best rating and most resistive to breakdown in a chemical…
Q: What size equipment grounding conductor is used with # 8 AWG nonmetallic-sheathed cable
A: The minimum size equipment grounding conductor is selected on the basis of the current rating…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- TII 8.) 4 – 3 kW, 230 V and 3 – 8.5 kW, 230 V clothes dryers are to be placed in a building, the total VA loading to be used for these in the computation for service entrance conductor is: A. 24375 B. 37500 C. 33750 D. 36000Calculate the following. a) Expected voltage at “A” with switch SW1 open. b) Expected voltage at “A” with switch SW1 closed.a) Determine total admittance and impedance. b) Draw admittance diagram and impedance diagram. c) Determine the values of C and L. d) Determine the voltage ?? ⃗ and the currents ?? (Se image ! last task)
- Determine the size and type of wire to he installed to a building with temperature that reaches 80-90 degrees with the following loads. 10pcs. Of 200- watt bulb 15pcs. Of 100-watt bulb Single phase, 230 source. And if you would be installing the wire inside an EMT conduit, what size would you use assuming that there would be 4 wires inside the EMT1. Question text In solar module, minimum value of shunt resistance could be 300 Ohm. Select one: True Falselist the material required for overhead service connection
- 11. Describe the operation of a vector impedance meter with the help of a block diagram. Explain the function of each block.Describe and discuss the electrical load requirements for different types of buildings.h.1. In an alternating-current system, the maximum size for a copper grounding electrode conductor isA. 250 kcmil.B. 3/0.C. 500 kcmil.D. 4/0. h.2. The figure shows a fault condition in an ungrounded electrical system. Which of the following will occurbecause of the fault in this system?A. Only the overcurrent protector at Point A will trip open.B. The ground fault will heavily damage the service.C. Nothing will happen until a second ground fault occurs.D. The overcurrent protection will trip, shutting off all the line side power.
- Table 1 gives the unit charges of a 3 unit system. Initially the unit 2 is ON for 4 hours. Min. up time is 3 hours for all the units. The priority schedule is 2-1-3. Determine the unit commitment schedule. Unit Max. Incr. Cost #3 No load Start up Load MW Rs./MW cost Rs./Hr. cost Rs. pattern Hrs. MW 200 75 100 100 1-2 400 2 200 3 75 100 100 3-4 500 5-6 200 100 100 100 200 7-8 200 Table 1 undefinedThe term "____" is defined in NEC® Article 100 as "connected to establish electrical continuity and conductivity." Select one: A. BENDED (BENDING) B. BONDED (BONDING) C. SHUNTED (SHUNTING) D. GROUNDED (GROUNDING)Pls help me answer this . DC Voltage has ______ polarity