2. Solve this model using graphical and simplex method and compare the answers. A transistor radio Co., manufactures models A, B, and C which have profit contribution of Birr 16, Birr 30 and Birr 50 respectively. The weekly minimum production requirements are 20 for model A, 120 for model B, and 60 for model C. Each type of radio requires a certain amount of time for the manufacturing of component parts, assembly and packaging. Specifically a dozen unit of model A requires 3 hrs for manufacturing of component parts, 4b hrs for assembly and 1 hr for packaging. The corresponding figure for a dozen unit of model B is 3.5, 5 and 1.5 and for a dozen unit of C are 5, 8, and 3 hrs. During the forth coming week, the company has availability of 120 hrs of manufacturing, 160 hrs of assembly, and 45 hrs of packaging time. Required: a) Formulate the scheduling problem as LPM. b) Solve the problem using simplex method c) Identify basic and non basic variables at each iteration

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
2. Solve this model using graphical and simplex method and compare the answers.
A transistor radio Co., manufactures models A, B, and C which have profit contribution of Birr 16,
Birr 30 and Birr 50 respectively. The weekly minimum production requirements are 20 for model A,
120 for model B, and 60 for model C. Each type of radio requires a certain amount of time for the
manufacturing of component parts, assembly and packaging.
Specifically a dozen unit of model A requires 3 hrs for manufacturing of component parts, 4b hrs
for assembly and 1 hr for packaging. The corresponding figure for a dozen unit of model B is 3.5,
5 and 1.5 and for a dozen unit of C are 5, 8, and 3 hrs. During the forth coming week, the company
has availability of 120 hrs of manufacturing, 160 hrs of assembly, and 45 hrs of packaging time.
Required:
a) Formulate the scheduling problem as LPM.
b) Solve the problem using simplex method
c) Identify basic and non basic variables at each iteration
Transcribed Image Text:2. Solve this model using graphical and simplex method and compare the answers. A transistor radio Co., manufactures models A, B, and C which have profit contribution of Birr 16, Birr 30 and Birr 50 respectively. The weekly minimum production requirements are 20 for model A, 120 for model B, and 60 for model C. Each type of radio requires a certain amount of time for the manufacturing of component parts, assembly and packaging. Specifically a dozen unit of model A requires 3 hrs for manufacturing of component parts, 4b hrs for assembly and 1 hr for packaging. The corresponding figure for a dozen unit of model B is 3.5, 5 and 1.5 and for a dozen unit of C are 5, 8, and 3 hrs. During the forth coming week, the company has availability of 120 hrs of manufacturing, 160 hrs of assembly, and 45 hrs of packaging time. Required: a) Formulate the scheduling problem as LPM. b) Solve the problem using simplex method c) Identify basic and non basic variables at each iteration
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.