1. Determine the amount of value-added and non-value-added lead time and the value-added ratio in this process for an average stereo unit in a batch of 45 units. Round percentages to one decimal place. Categorize the non-value-added time into wait and move time. Value-added lead time 39 ✓ min. Non-value-added lead time: Wait time lead time Move time lead time Total non-value-added lead time Total lead time Value-added ratio (as a percent) 2. Move time in this process could best be reduced by: a. Doing nothing. b. Changing the layout from a process orientation to a product orientation. c. Increasing batch sizes. d. Eliminating the testing step. e. Hiring more workers. b X min. 30 min. X min. 1,810 min. X%

Managerial Accounting
15th Edition
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:Carl Warren, Ph.d. Cma William B. Tayler
Chapter13: Lean Manufacturing And Activity Analysis
Section: Chapter Questions
Problem 2PA
icon
Related questions
Question
Required:
1. Determine the amount of value-added and non-value-added lead time and the value-added ratio in this process for an average stereo unit in a batch of 45
units. Round percentages to one decimal place. Categorize the non-value-added time into wait and move time.
39 ✓ min.
Value-added lead time
Non-value-added lead time:
Wait time lead time
Move time lead time
Total non-value-added lead time
Total lead time
Value-added ratio (as a percent)
2. Move time in this process could best be reduced by:
X min.
30 min.
X min.
1,810 min.
X%
a. Doing nothing.
b. Changing the layout from a process orientation to a product orientation.
c. Increasing batch sizes.
d. Eliminating the testing step.
e. Hiring more workers.
Transcribed Image Text:Required: 1. Determine the amount of value-added and non-value-added lead time and the value-added ratio in this process for an average stereo unit in a batch of 45 units. Round percentages to one decimal place. Categorize the non-value-added time into wait and move time. 39 ✓ min. Value-added lead time Non-value-added lead time: Wait time lead time Move time lead time Total non-value-added lead time Total lead time Value-added ratio (as a percent) 2. Move time in this process could best be reduced by: X min. 30 min. X min. 1,810 min. X% a. Doing nothing. b. Changing the layout from a process orientation to a product orientation. c. Increasing batch sizes. d. Eliminating the testing step. e. Hiring more workers.
Lead Time
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and
shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each
operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 45 printed circuit boards. Each board
requires 5 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move
takes 10 minutes to complete.
The final assembly for each stereo unit requires 15 minutes and is also done in batches of 45 units. A batch of 45 stereos is moved into the test building, which
is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup
requires 25 minutes. The units wait while the setup is performed. In the final test, the 45-unit batch is tested one at a time. Each test requires 9 minutes. The
completed batch, after all testing, is sent to shipping for packaging and final shipment to customers. A complete batch of 45 units is sent from testing to
shipping. The Shipping Department is located next to testing. Thus, there is no move time between these two operations. Packaging and labeling requires 10
minutes per unit.
Transcribed Image Text:Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 45 printed circuit boards. Each board requires 5 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 15 minutes and is also done in batches of 45 units. A batch of 45 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 25 minutes. The units wait while the setup is performed. In the final test, the 45-unit batch is tested one at a time. Each test requires 9 minutes. The completed batch, after all testing, is sent to shipping for packaging and final shipment to customers. A complete batch of 45 units is sent from testing to shipping. The Shipping Department is located next to testing. Thus, there is no move time between these two operations. Packaging and labeling requires 10 minutes per unit.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Knowledge Booster
Value Chain Analysis
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Managerial Accounting
Managerial Accounting
Accounting
ISBN:
9781337912020
Author:
Carl Warren, Ph.d. Cma William B. Tayler
Publisher:
South-Western College Pub
Cornerstones of Cost Management (Cornerstones Ser…
Cornerstones of Cost Management (Cornerstones Ser…
Accounting
ISBN:
9781305970663
Author:
Don R. Hansen, Maryanne M. Mowen
Publisher:
Cengage Learning
Financial And Managerial Accounting
Financial And Managerial Accounting
Accounting
ISBN:
9781337902663
Author:
WARREN, Carl S.
Publisher:
Cengage Learning,
Managerial Accounting: The Cornerstone of Busines…
Managerial Accounting: The Cornerstone of Busines…
Accounting
ISBN:
9781337115773
Author:
Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger
Publisher:
Cengage Learning