Class Activities: Version 3.0
Effective Date: 01/07/2021
Review Date: 01/11/2023
All printed copies of this Document are considered 'Uncontrolled Copies'. Printed copies are only valid for the day printed
. Page 3
of 20
CPCCCM2012
Work safely at heights
CLASS ACTIVITIES - Student
CPCCCM2012 - Work safely at heights
Question 1: According to Safe Work Australia’s 2018, what are the areas that need special attention
while working at heights?
The areas that need special attention are:
close to an exposed edge that isn't covered, like the edges of leading formwork or unfinished
stairwells.
utilizing tools to perform tasks at an elevated height, such as portable ladders or elevating
work platforms (EWPs)
on any building or equipment that is being built, installed, dismantled, inspected, tested,
cleaned, or repaired.
on or near a delicate surface, such as skylights, rusted metal roofs, cement sheeting roofs, or
fiberglass sheeting roofs.
close to a hole, shaft, or pit that a worker could fall into, such as trenches;
on a sloping or slippery surface where it is difficult for people to maintain their balance; and
on an unstable surface, such as one where there is a chance of the ground collapsing.
Question 2: Explain the steps to determine job priorities and sequence job tasks in consultation with
a relevant person on site.
Compile job instructions:
The qualities required to finish a specific job or task are known as work specifications and
strategies. A guidebook that contains designs, specifications, standards for quality, operational information,
and accuracy checks on the work might be necessary. Prioritize tasks and arrange them in order of completion:
Worksite, environmental, and organizational safety strategies must be followed at all times.
Procedures ensure that the work is done safely, preventing damage to tools and placing people in
risky situations. They also aid in making sure that the tasks are finished in the proper sequence
and don't interfere with or obstruct other tasks being done on the site.
Class Activities: Version 3.0
Effective Date: 01/07/2021
Review Date: 01/11/2023
All printed copies of this Document are considered 'Uncontrolled Copies'. Printed copies are only valid for the day printed
. Page 3
of 20
Question 3: Write down the various factors to consider while preparing SWMS for a specific task.
The various factors to consider while preparing SWMS for a specific task are:
Address about high-risk construction activity like risks, hazards and control methods and
communicate with appropriate construction workers.
A column labelled "High-Risk Construction Work" should exist, providing an overview of
the high-risk construction projects that need to be performed.
A column of hazards and risks.
Conditions like work environment that influence how the construction work with high-risk
will be done, for example: construction plan, working environment, safe work methods
and pant to be used
A column of “control measures” with hierarchy of controls.
Question 4: Explain various control measures to avoid any risk at workplace.
The control measures to avoid any risk at workplace are:
Use PPE kits – this preventive measure is of the bottom order and applied when other
measures are not effective. It does not lower the hazard.
Use signs – there are different signs available according to need. These are prohibition signs,
mandatory, restriction, hazard, emergency, fire signs
Use fall restraint device - it protects the person from fall. Guard rail and barriers are installed
for more protection.
Use a fall arrest system – it protects the worker by avoiding the fall before striking the ground
after he fell.
Use administrative controls – this is effective when other measures are unsuccessful. It
comprises numerous design methods and actions to minimise hazards.
Class Activities: Version 3.0
Effective Date: 01/07/2021
Review Date: 01/11/2023
All printed copies of this Document are considered 'Uncontrolled Copies'. Printed copies are only valid for the day printed
. Page 3
of 20
Question 5: Mention below the various locations of anchor points for safe access to the work area. The various locations of anchor points for safe access to the work area are:
1.
Roof – they are mostly permanent type and pinned into the roof surface. A simple anchor
connection contains a D-ring connection whereas complex system comprises a complete
lifeline system.
2.
Door and windows - To install anchor points, a jamb anchor is used to secure the window and
door frames. It is always wider than door or window frame
3.
Walls – permanent anchor points can be nailed into the walls. After drilling a hole in the wall
and then anchor points is fixed
4.
Crane or vehicle – anchor points can be connected on a crane or vehicle which can bear high
load and stable Question 6: What are various types of protection required and their descriptions
Protection location
Description
Hand Gloves Respiratory Filtering respirators and masks
Skin Sunscreen cream
Foot Steel toe boots
Class Activities: Version 3.0
Effective Date: 01/07/2021
Review Date: 01/11/2023
All printed copies of this Document are considered 'Uncontrolled Copies'. Printed copies are only valid for the day printed
. Page 3
of 20
Eyes
Safety glasses
Noise Ear muffs
Head Hard hats
Question 7: How can you prevent the risk of fall from height?
The risk of fall from height can be prevented by using following measures:
Using fall prevention devices – the fall prevention devices such as guard rails and scaffolding
can be used to reduce the risk of fall due to unbalanced and fragile surfaces.
Using different types of work positioning systems – work positioning system such as a rope
access system can also be used. Question 8: What is meant by Elevated work platforms (EWPs)? List its types, characteristics, uses
and limitations.
Elevated work platform is a mobile machine (device) featuring at least a work platform with
controls, an extending frame, and a chassis is meant to transfer people, tools, and materials to
working locations.
Types- Self-propelled elevating work platforms, Boom-type elevating work platform and elevating
Rolling work platforms
Characteristics – packed position, monitor from the work platform Uses – during working at height used for lifting or lowering weights.
Limitations – chances of toppling
Class Activities: Version 3.0
Effective Date: 01/07/2021
Review Date: 01/11/2023
All printed copies of this Document are considered 'Uncontrolled Copies'. Printed copies are only valid for the day printed
. Page 3
of 20
Question 9: What are the safety manuals and instructions for checking plant, tools and equipment?
The safety manuals and instructions for checking plant, tools and equipment are:
Operation manuals – the detailed document that helps workers operating well by providing
information of equipment and its parts. Each tool or equipment has a ‘Operation manual’
which explains their working. These are essential guidelines which guarantees the safe usage
of the tools or equipment.
Manufacturer specifications - this provides technical data of tools and equipment which guard
the workers form the hazards related to a tool or equipment.
Safety signs and load charts for plants: these are available in several layouts in order to
protect workers from possible hazard resulting from defective tools, equipment and plants.
Load chart is an illustration and diagram that shows how much authorised work a tool, plant,
or equipment would be able to carry out.
Question 10: What is meant by signs? List the correct titles for these signs.
Signs are essential components of any construction site since they are vital instruments for
guaranteeing security and safety. These are extremely important for directing workers,
communicating important information, and warning guests of potential dangers. They can be in
pictures, written or both. The various forms of signs are:
Prohibition signs (don’t do)
Restriction signs (limiting)
Hazard signs (warning signs)
Mandatory signs (must do)
Fire signs
Emergency signs (medical, exit etc.)
Class Activities: Version 3.0
Effective Date: 01/07/2021
Review Date: 01/11/2023
All printed copies of this Document are considered 'Uncontrolled Copies'. Printed copies are only valid for the day printed
. Page 3
of 20
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Case Study – The New Engineer
Jeff was just hired by GSI, Inc. to be their Environmental and Safety Coordinator. This is Jeff's first position after completing his engineering degree. He had taken a course in safety engineering as part of his studies and felt confident that he could handle the job.
Management at GSI, Inc. has assured him that they are committed to maintaining a safe workplace. They have never had an individual dedicated to this task full-time. They will implement his recommendations if he can justify them.
As Jeff begins to get familiar with the operations, he spends considerable time on the production floor. He notices workers clean their tools before break with a liquid from an unmarked 55-gallon drum. They also use this liquid to clean residue from their skin. They use paper towels to dry their tools and hands, throw these towels in the trash, and head to the break room for a snack and/or smoke.
In talking with the workers, Jeff learns of some of…
arrow_forward
Case Study – The New Engineer
Jeff was just hired by GSI, Inc. to be their Environmental and Safety Coordinator. This is Jeff's first position after completing his engineering degree. He had taken a course in safety engineering as part of his studies and felt confident that he could handle the job.
Management at GSI, Inc. has assured him that they are committed to maintaining a safe workplace. They have never had an individual dedicated to this task full-time. They will implement his recommendations if he can justify them.
As Jeff begins to get familiar with the operations, he spends considerable time on the production floor. He notices workers clean their tools before break with a liquid from an unmarked 55-gallon drum. They also use this liquid to clean residue from their skin. They use paper towels to dry their tools and hands, throw these towels in the trash, and head to the break room for a snack and/or smoke.
In talking with the workers, Jeff learns of some of…
arrow_forward
SUBJECT - MACHINE SHOP & THEORY1. Identify the different hazards shown in the image.
2. List down the different hazards that you identified.
3. Explain the corrective measures to be done in each identified hazards in order to make safe your working environment
There are unsafe workplaces but none can be more unsafe than this one. Your goal is to find at least 22 unsafe acts and conditions in this image.
There are total 25 hazards but you need to identify just 22 to complete the activity.
arrow_forward
ADAMSON UNIVERSITY
College of Engineering
Civil Engineering Department
Answer Sheet
Name:
Date:
Course:
Time:
4m
4m
100 t
200 kat
arrow_forward
please help solve A-F. thank you
You are an engineer working on a project and your prototype has failed prematurely. You question whether or not a key component of the prototype was manufactured with the correct material. There are two way to check for the material properties. The first way is to have a material certification done to confirm the exact material composition. This will take some time. The second method to confirm the material properties is to make an ASTM test sample and test for the material properties. This tensile test was completed on a test sample with an initial diameter of .501” and an initial length of 2”. The Load-Deflection data for this tensile test is below. Use this data to answer the first set of questions on the Final Exam in eLearning. A. Determine the Ultimate Tensile Strength B. Determine the 0.2% Offset Yield Strength C. Determine the value of the Proportional Limit D. Determine the Modulus of Elasticity E. Determine the Strain at Yield F. Calculate %…
arrow_forward
Task 1: As a maintenance manager at a plant, you are required to update the existing maintenance plan for one
of the critical plant's systems. This entails defining economical and technically practical maintenance
interventions while considering a high level of safety.
What are the potential approaches for maintenance interventions that could be included in the current
maintenance plan? Provide definitions for each of them, outline their advantages and disadvantages, and
support them with real-life examples.
-
State two potential maintenance decision-making strategies you could adopt and clarify their steps and
logic of implementation.
Introduce and explain the concept of Prognostics and Health Management (PHM). Describe what PHM
entails, as well as its benefits and expectations.
- Explain how the frequency of planned maintenance interventions can impact production and costs for a
specific component.
Clarify the process for selecting the best maintenance intervention approach for that…
arrow_forward
Question 2
You are a biomedical engineer working for a small orthopaedic firm that fabricates rectangular shaped fracture
fixation plates from titanium alloy (model = "Ti Fix-It") materials. A recent clinical report documents some problems with the plates
implanted into fractured limbs. Specifically, some plates have become permanently bent while patients are in rehab and doing partial
weight bearing activities.
Your boss asks you to review the technical report that was generated by the previous test engineer (whose job you now have!) and used to
verify the design. The brief report states the following... "Ti Fix-It plates were manufactured from Ti-6Al-4V (grade 5) and machined into
solid 150 mm long beams with a 4 mm thick and 15 mm wide cross section. Each Ti Fix-It plate was loaded in equilibrium in a 4-point bending
test (set-up configuration is provided in drawing below), with an applied load of 1000N. The maximum stress in this set-up was less than the
yield stress for the…
arrow_forward
subject: quality control
topic : six sigma
What are the financial benefits are reported by the organization after the successful implementation in the world?
arrow_forward
Case Study: Paula’s Pain
Paula has worked for Brindle Corporation for 3 years. During this time, she has worked as a machine operator/cell leader in various work cells. Recently, the plant went to mandatory 12-hour shifts and plans to remain on this schedule for several months.
Paula’s present work cell is manufacturing 3-inch diameter exhaust tubes that are made from stainless steel. These tubes get a hole punched in them, a flange welded on, and burrs ground off. The pipe then gets placed into a gage to check that it was made correctly. (The tubes weigh about six pounds.)
Paula has been performing the welding operation. She leans into the machine and loads the part into a fixture then positions the flange. Both pieces are clamped (using hand clamps) into position and the machine is cycled by depressing two palm buttons.
The gaging operation requires placing the finished part into the gage and clamping it (using hand clamps) into place. A pin is depressed to verify the position…
arrow_forward
Cathy Gwynn for a class project is analyzing a "Quick Shop" grocery store. The store emphasizes quick service, a limited assortment of grocery items, and higher prices. Cathy wants to see if the store hours (currently 0600 to 0100) can be changed to make the store more profitable.
Time Period
Daily Sales in the Time Period
0600-0700
$40
0700-0800
70
0800-0900
120
0900-1200
400
1200-1500
450
1500-1800
500
1800-2000
600
2000-2200
200
2200-2300
50
2300-2400
85
2400-0100
40
The cost ofthe groceries sold averages 65% of sales. The incremental cost to keep the store open, including the clerk's wage and other operating costs, is S23 per hour. To maximize profit, when should the store be opened, and when should it be closed?
arrow_forward
Q#4:
Differentiate between a hazard, a risk, an accident and a near miss.
Name at least five hazards that you can identify in the Mechanical Workshop of the Mechanical Engineering Department, Faculty of Engineering, SUIT.
What sort of safety training, first-aid requirement, and emergency procedures would you recommend in order to ensure the safety of students, faculty, staff and university assets?
arrow_forward
Global Citizenship and Equity Assignment
Objective:
In this assignment you will reliably demonstrate the ability to Analyze
issues of equity at the personal, professional, or global level with respect to
quality assurance.
Details:
Write one page report about relationship between global citizenship &
equity and quality assurance.
Word limit for the assignment is 225 – 275. With font size being 11 or 12.
Double spaced.
Include Bibliography and/or Citation for your sources used.
arrow_forward
Task 2
The transfer of heat from one fluid to another is an essential component of all chemical processes.
Whether it is to cool down a chemical after it has been formed during an exothermic reaction, or
to heat components before starting a reaction to make a final product, the thermal processing
operation is core to the chemical process. It is essential that heat transfer systems for chemical
processes are designed to maximize efficiency. Because the heat transfer step in many chemical
processes is energy intensive, a failure to focus on efficiency can drive up costs unnecessarily.
Task expected from student:
a) Compare the basic design between the classifications of heat exchanger equipment's (Any
three HE equipment's).
b) Summarize the merits, demerits, limitations and applications of heat exchanger equipment's
with neat sketch.
arrow_forward
P Flag question
The following method conduct a brainstorming session to understand the likelihood of future events and impact they may have on
project
Select one:
Delphi Technique
O b. Time series models
O C. Causal models
O d. Market Research
arrow_forward
25.
A defense department assigned its highest priority to develop an advanced aircraft using materials not previously used and untested technologies. A firm fixed-price contract was awarded to a qualified vendor. Controls were in place at all levels, and progress reports—noting challenges—were sent to top officials. Top officials reported that progress was excellent, but the project failed due to enormous expenditures with no aircraft developed. Which risks were not adequately considered?
I. Because the requirements were not specific, the use of a firm fixed-price contract made the project risky.
II. The personnel at many levels sent false reports forward on cost incurred and progress made.
III. The contractor lacked adequate technical skills to deal with technology that was still evolving.
IV. Top procurement officials did not act on “red flags” due to a “can do” mentality on a high priority of the program.
Group of answer choices
I and IV only
I only
II and III only
None…
arrow_forward
Assignment 1: TIME VALUE OF MONEY
Objective: To further understand the concept of the time value of money.
INSTRUCTIONS:
In each problem,
a. Translate data given in problems into their respective graphical representations - i.e. draw
the correct cash flow diagram.
b. Write down all pertinent given information or data on your paper.
c. Calculate answers correctly.
3. A certain college graduate, Sallie Evans, has $24,000 in student-loan debt at the end of
her college career. The interest rate on this debt is 0.75% per month. If monthly payments
on this loan are $432.61, how many months will it take for Sallie to repay the entire loan?
arrow_forward
Subject : engineering design - DFMA
arrow_forward
Question 1
Manufacturing process requires a cohesive teamwork to produce a final product. Choose
5 different roles that are held by the employees in a manufacturing environment and
highlight their responsibilities.
arrow_forward
QUESTION 5
A mechanical engineer is working in a consultancy company as a design mechanical engineering the design
division. He is preparing design documents for several projects. A civil engineer prepared some design
documents related to the civil work of a project and he asked the mechanical engineer to sign and seal the
documents of the civil work.
a. What is the problem
b. What is the professional beavior that the civil engineer should follow?
arrow_forward
This is an engineering problem and not a writing assignment. Please Do Not Reject. I had other engineering tutors on bartleby help me with problems similar to this one.
This problem must be presented in a logical order showing the necessary steps used to arrive at an answer. Each homework problem should have the following items unless otherwise stated in the problem:
a. Known: State briefly what is known about the problem.
b. Schematic: Draw a schematic of the physical system or control volume.
c. Assumptions: List all necessary assumptions used to complete the problem.
d. Properties: Identify the source of property values not given to you in the problem. Most sources will be from a table in the textbook (i.e. Table A-4).
e. Find: State what must be found.
f. Analysis: Start your analysis with any necessary equations. Develop your analysis as completely as possible before inserting values and performing the calculations. Draw a box around your answers and include units and follow an…
arrow_forward
Engineering Management :
Please Read your Reference: www.bigrentz.com for your own. Topic is " Top 10 Construction
Industry Trends To Watch For In 2022" Answer The following this.
Make a reaction paper of the statement. In precisely five paragraphs,
minimum of five sentences per paragraph, discuss your stand regarding
the statement with at least 5 reliable references supporting your reaction.
CONSTRUCTION
Top 10 Construction
Industry Trends To
Watch For In 2022
By: BigRentz, Inc. on December 13,
2021
in
2022
arrow_forward
b) After leaving CBU you are running
company dealing in material design,
manufacturing
customer has asked your company
to test a few samples which you
suspect to be mild steel. You have
therefore asked your subordinates,
technicians, to carry out these tests.
Results are as shown in Fig.1. For
you to write a report, which is critical
if your company has to be paid,
explain the following to your
customer:
and testing.
A
Curve Y
Curve X
Stres
Fig.1: Stress-strain ourves
1) Material properties labelled A, B, C and D
2) How do you detemine the material's Young's modulus?
3) What's the difference between Curve X and Curve Y?
4) What measurements would you take if you are to determine Poisson's ratio
Stress
arrow_forward
Mechanical Advantage Review
Directions: Use the appropriate equation to answer the following questions. All answers
should be recorded below or in your engineering design journal. Remember to show all work.
1. A lever has an effort arm that is 8 meters long and the resistance (load) arm that is
5 meters long, how much effort is needed to lift a 200 Newton weight?
arrow_forward
Job Safety Analysis on a task and must have a minimum of five discrete steps and some risks associated with performing it. This task couldbe changing the tire on your car.
arrow_forward
The worker shown below is using a 10-lb pneumatic nut runner to tighten nuts within a tractor cab compartment. What are health and safety problems likely to result from her job? Evaluate the job and the
workstation identifying poor work design features. Please come up with at least five poor design features.
(Please refer to the format of the answers in the class example solution)
No.
1
2
3
4
園
5
Problem
Ergonomics Improvement
Design Principle
arrow_forward
The following is a series of questions pertaining to the NSPE Code of Ethics. Please indicate whether the statements are true or false. These questions are provided by the NSPE.
Note: This ethics test is intended solely to test individual knowledge of the specific language contained in the NSPE Code of Ethics and is not intended to measure individual knowledge of engineering ethics or the ethics of individual engineers or engineering students.
Engineers shall acknowledge their errors after consulting with theiremployer or client.
arrow_forward
9. A defense department assigned its highest priority to develop an advanced aircraft using materials not previously used and untested technologies. A firm fixed-price contract was awarded to a qualified vendor. Controls were in place at all levels, and progress reports—noting challenges—were sent to top officials. Top officials reported that progress was excellent, but the project failed due to enormous expenditures with no aircraft developed. Which risks were not adequately considered?
I. Because the requirements were not specific, the use of a firm fixed-price contract made the project risky.
II. The personnel at many levels sent false reports forward on cost incurred and progress made.
III. The contractor lacked adequate technical skills to deal with technology that was still evolving.
IV. Top procurement officials did not act on “red flags” due to a “can do” mentality on a high priority of the program.
Group of answer choices
II and III only
I only
None of the choices
I,…
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Elements Of Electromagnetics
Mechanical Engineering
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Oxford University Press
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:9780134319650
Author:Russell C. Hibbeler
Publisher:PEARSON
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:9781259822674
Author:Yunus A. Cengel Dr., Michael A. Boles
Publisher:McGraw-Hill Education
Control Systems Engineering
Mechanical Engineering
ISBN:9781118170519
Author:Norman S. Nise
Publisher:WILEY
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:9781337093347
Author:Barry J. Goodno, James M. Gere
Publisher:Cengage Learning
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:9781118807330
Author:James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:WILEY
Related Questions
- Case Study – The New Engineer Jeff was just hired by GSI, Inc. to be their Environmental and Safety Coordinator. This is Jeff's first position after completing his engineering degree. He had taken a course in safety engineering as part of his studies and felt confident that he could handle the job. Management at GSI, Inc. has assured him that they are committed to maintaining a safe workplace. They have never had an individual dedicated to this task full-time. They will implement his recommendations if he can justify them. As Jeff begins to get familiar with the operations, he spends considerable time on the production floor. He notices workers clean their tools before break with a liquid from an unmarked 55-gallon drum. They also use this liquid to clean residue from their skin. They use paper towels to dry their tools and hands, throw these towels in the trash, and head to the break room for a snack and/or smoke. In talking with the workers, Jeff learns of some of…arrow_forwardCase Study – The New Engineer Jeff was just hired by GSI, Inc. to be their Environmental and Safety Coordinator. This is Jeff's first position after completing his engineering degree. He had taken a course in safety engineering as part of his studies and felt confident that he could handle the job. Management at GSI, Inc. has assured him that they are committed to maintaining a safe workplace. They have never had an individual dedicated to this task full-time. They will implement his recommendations if he can justify them. As Jeff begins to get familiar with the operations, he spends considerable time on the production floor. He notices workers clean their tools before break with a liquid from an unmarked 55-gallon drum. They also use this liquid to clean residue from their skin. They use paper towels to dry their tools and hands, throw these towels in the trash, and head to the break room for a snack and/or smoke. In talking with the workers, Jeff learns of some of…arrow_forwardSUBJECT - MACHINE SHOP & THEORY1. Identify the different hazards shown in the image. 2. List down the different hazards that you identified. 3. Explain the corrective measures to be done in each identified hazards in order to make safe your working environment There are unsafe workplaces but none can be more unsafe than this one. Your goal is to find at least 22 unsafe acts and conditions in this image. There are total 25 hazards but you need to identify just 22 to complete the activity.arrow_forward
- ADAMSON UNIVERSITY College of Engineering Civil Engineering Department Answer Sheet Name: Date: Course: Time: 4m 4m 100 t 200 katarrow_forwardplease help solve A-F. thank you You are an engineer working on a project and your prototype has failed prematurely. You question whether or not a key component of the prototype was manufactured with the correct material. There are two way to check for the material properties. The first way is to have a material certification done to confirm the exact material composition. This will take some time. The second method to confirm the material properties is to make an ASTM test sample and test for the material properties. This tensile test was completed on a test sample with an initial diameter of .501” and an initial length of 2”. The Load-Deflection data for this tensile test is below. Use this data to answer the first set of questions on the Final Exam in eLearning. A. Determine the Ultimate Tensile Strength B. Determine the 0.2% Offset Yield Strength C. Determine the value of the Proportional Limit D. Determine the Modulus of Elasticity E. Determine the Strain at Yield F. Calculate %…arrow_forwardTask 1: As a maintenance manager at a plant, you are required to update the existing maintenance plan for one of the critical plant's systems. This entails defining economical and technically practical maintenance interventions while considering a high level of safety. What are the potential approaches for maintenance interventions that could be included in the current maintenance plan? Provide definitions for each of them, outline their advantages and disadvantages, and support them with real-life examples. - State two potential maintenance decision-making strategies you could adopt and clarify their steps and logic of implementation. Introduce and explain the concept of Prognostics and Health Management (PHM). Describe what PHM entails, as well as its benefits and expectations. - Explain how the frequency of planned maintenance interventions can impact production and costs for a specific component. Clarify the process for selecting the best maintenance intervention approach for that…arrow_forward
- Question 2 You are a biomedical engineer working for a small orthopaedic firm that fabricates rectangular shaped fracture fixation plates from titanium alloy (model = "Ti Fix-It") materials. A recent clinical report documents some problems with the plates implanted into fractured limbs. Specifically, some plates have become permanently bent while patients are in rehab and doing partial weight bearing activities. Your boss asks you to review the technical report that was generated by the previous test engineer (whose job you now have!) and used to verify the design. The brief report states the following... "Ti Fix-It plates were manufactured from Ti-6Al-4V (grade 5) and machined into solid 150 mm long beams with a 4 mm thick and 15 mm wide cross section. Each Ti Fix-It plate was loaded in equilibrium in a 4-point bending test (set-up configuration is provided in drawing below), with an applied load of 1000N. The maximum stress in this set-up was less than the yield stress for the…arrow_forwardsubject: quality control topic : six sigma What are the financial benefits are reported by the organization after the successful implementation in the world?arrow_forwardCase Study: Paula’s Pain Paula has worked for Brindle Corporation for 3 years. During this time, she has worked as a machine operator/cell leader in various work cells. Recently, the plant went to mandatory 12-hour shifts and plans to remain on this schedule for several months. Paula’s present work cell is manufacturing 3-inch diameter exhaust tubes that are made from stainless steel. These tubes get a hole punched in them, a flange welded on, and burrs ground off. The pipe then gets placed into a gage to check that it was made correctly. (The tubes weigh about six pounds.) Paula has been performing the welding operation. She leans into the machine and loads the part into a fixture then positions the flange. Both pieces are clamped (using hand clamps) into position and the machine is cycled by depressing two palm buttons. The gaging operation requires placing the finished part into the gage and clamping it (using hand clamps) into place. A pin is depressed to verify the position…arrow_forward
- Cathy Gwynn for a class project is analyzing a "Quick Shop" grocery store. The store emphasizes quick service, a limited assortment of grocery items, and higher prices. Cathy wants to see if the store hours (currently 0600 to 0100) can be changed to make the store more profitable. Time Period Daily Sales in the Time Period 0600-0700 $40 0700-0800 70 0800-0900 120 0900-1200 400 1200-1500 450 1500-1800 500 1800-2000 600 2000-2200 200 2200-2300 50 2300-2400 85 2400-0100 40 The cost ofthe groceries sold averages 65% of sales. The incremental cost to keep the store open, including the clerk's wage and other operating costs, is S23 per hour. To maximize profit, when should the store be opened, and when should it be closed?arrow_forwardQ#4: Differentiate between a hazard, a risk, an accident and a near miss. Name at least five hazards that you can identify in the Mechanical Workshop of the Mechanical Engineering Department, Faculty of Engineering, SUIT. What sort of safety training, first-aid requirement, and emergency procedures would you recommend in order to ensure the safety of students, faculty, staff and university assets?arrow_forwardGlobal Citizenship and Equity Assignment Objective: In this assignment you will reliably demonstrate the ability to Analyze issues of equity at the personal, professional, or global level with respect to quality assurance. Details: Write one page report about relationship between global citizenship & equity and quality assurance. Word limit for the assignment is 225 – 275. With font size being 11 or 12. Double spaced. Include Bibliography and/or Citation for your sources used.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Elements Of ElectromagneticsMechanical EngineeringISBN:9780190698614Author:Sadiku, Matthew N. O.Publisher:Oxford University PressMechanics of Materials (10th Edition)Mechanical EngineeringISBN:9780134319650Author:Russell C. HibbelerPublisher:PEARSONThermodynamics: An Engineering ApproachMechanical EngineeringISBN:9781259822674Author:Yunus A. Cengel Dr., Michael A. BolesPublisher:McGraw-Hill Education
- Control Systems EngineeringMechanical EngineeringISBN:9781118170519Author:Norman S. NisePublisher:WILEYMechanics of Materials (MindTap Course List)Mechanical EngineeringISBN:9781337093347Author:Barry J. Goodno, James M. GerePublisher:Cengage LearningEngineering Mechanics: StaticsMechanical EngineeringISBN:9781118807330Author:James L. Meriam, L. G. Kraige, J. N. BoltonPublisher:WILEY
Elements Of Electromagnetics
Mechanical Engineering
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Oxford University Press
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:9780134319650
Author:Russell C. Hibbeler
Publisher:PEARSON
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:9781259822674
Author:Yunus A. Cengel Dr., Michael A. Boles
Publisher:McGraw-Hill Education
Control Systems Engineering
Mechanical Engineering
ISBN:9781118170519
Author:Norman S. Nise
Publisher:WILEY
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:9781337093347
Author:Barry J. Goodno, James M. Gere
Publisher:Cengage Learning
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:9781118807330
Author:James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:WILEY