©Dr. Ahmad Jrade 1 Civil Engineering CVG 4173A Construction Management Group Case Project Fall 2019 XYZ Manufacturing Inc. is one of the leading manufacturers of steering wheels, air bags, and shift levers. Located in Oakville, Ontario, XYZ provides services to some of the largest car companies in the world such as, Toyota, Ford, Nissan, and General Moto
rs. The company’s ever-
growing need for production has resulted in the greater need for warehouse and manufacturing space. Currently, XYZ Manufacturing Inc. is interested in building an additional 80,000 square foot warehouse to accommodate these needs. The 80,000 square foot addition in Oakville, Ontario will be added to an existing 194,000 square foot facility. This addition will provide adequate space for state-of-the-art equipment essential to the growing needs of the company. Located on the south east corner of the existing site, the addition will not only provide work space but also additional parking for new employees. To carry out the construction, a section of existing hot mix asphalt will have to be removed along with other site obstructions. The proposed building will allow XYZ Manufacturing Inc. to stay competitive in their area of expertise. As an expert, XYZ Manufacturing Inc. would like you to use the provided 3D model (Autodesk Revit 2018 version) and specifications to generate a report that contains details about the following requirements: •
Identify the quantities of material required for construction, •
The total cost of the project,
©Dr. Ahmad Jrade 2 •
The scope of the work by using a compatible WBS and by identifying all the associated work packages needed to build the warehouse, •
A work plan that shows the sequence of execution (sequential order of the construction activities), •
The construction time required to finish the project. To ease the difficulty of this case study, the assigned groups will need to complete the following modules in due course. This will help you overcome carried forward mistakes especially since all the case components are dependent on each other. Also, this will allow groups to correct or modify any items before the final submission. Each group may have different answers, and thus the grading is based on the methodology followed. Use the provided model to complete the following: •
Module 1 (Due on 05 November 2019)
: o
Create a WBS that will help determine the scope of all the project work, o
Calculate excavation and backfilling quantities, o
Calculate a preliminary cost estimate by using R. S. Means, o
Create a quantity takeoff list for all items, •
Module 2 (Due on 19 November 2019)
: o
Determine the machinery required in excavation and backfilling, o
Identify the productivity of each machine and determine the time required to operate each machine based on quantities, o
Calculate the remaining quantities and the costs required for the whole work packages (identified in the WBS), •
Module 3 (Due on 3 December 2019)
: o
Identify the labor crews required by each work package (identified in the WBS), o
Identify the crew size required for each work package, o
Identify the productivity of each crew per package, o
Identify the time required to construct each work package based on the calculated productivities, o
Develop a network using MS project (based on the WBSs) that indicates the time for each work package, o
Calculate the probability of finishing the project within the calculated duration,
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Recognize the different types of equipment used in the railroad industry
arrow_forward
The figure has h-30, why is that? What is the purpose and meaning of putting h-30?
arrow_forward
Support your answer for Road over the rail or rail over the Road ...by discussing advantages and disadvantages of each option
arrow_forward
History of Autodesk AutoCAD
arrow_forward
FIND THE Vmax AND Mmax. ASAP THANK YOU
arrow_forward
Question Seven
(a) Name four important goals of materials selection?
(b) Packaging material comes in different forms. Give two common packaging materials and explain four
parameters that you would consider when selecting any of the two materials for packaging purposes.
(c) Explain three properties and uses of wood as a construction material. Why is wood preferred to steel
especially for erecting roof structures?
(d) Using the materials optimisation loop triangle, briefly explain why school chairs are preferably made
from wood.
arrow_forward
Which of the following is one of the two primary causes of accidents?
a. unmaintained tools
b. hazardous materials
c. unsafe environment
arrow_forward
List 4 ways metallurgy can help make roads better.
arrow_forward
What do you know about the CHEMFLO 2000 model?
arrow_forward
Engineering Management ,i need solutions in 10 minutes please.
MCQ/For the activities in the table shown below. Use (A.O.A) method to find the critical path CP.
A-ADMJN
B-AEKN
C-CFKN
D-BEKN
E-ADMIN
F-ACFGN
G-ADBEKN
H-CFGN
arrow_forward
List four ways knowledge in metallurgy can be used in road construction. Do not explain but add references.
arrow_forward
I need a solution quickly, Use ACI Code
arrow_forward
Hand written plz..... Fast plzzz asap pzlzzzz i'll give you vote plz fast plzzzzzzz
arrow_forward
Thank you again for quickly solving my other problems. I would be glad if you could help me in this problem
arrow_forward
I need the solution with in 30 minutes
Thank u
arrow_forward
Q19.
Q20.
Q21.
Which are the followings technologies inclusive in Industrial Revolution 4.0
A. Pre-fabrication and Modular Construction
B.
Advanced Building Materials
C. Building Information Modelling
D. All of the above is correct
Which of the following is best describe BIM timeline Level 2
A. Full integration. Full collaboration and full integration in a cloud-based
environment. Include Asset Life Cycle and Facilities Management(7D)
Low Collaboration. Computer Aided Design (CAD) is used to create
drawings. Paper and prints are shared with the team.
Full Collaboration. Adds additional dimensions such as Time
Management and Budget Calculation. Full collaboration and partial
interoperability through the use of distinct CAD model.
D. Partial Collaboration 2D drafts are combined with 3D models in a
Common Data Environment (CDE). Limited collaboration.
B.
C.
Which of the followings statement describes about the Life Span of product in
decision making for a project?
I.
II.
IV.
A.
B.
C.
D.…
arrow_forward
Estimate the average pressure exerted on the road bythe following.a. A family carb. A truckc. A bulldozerDiscuss your findings.
arrow_forward
Solve Question and Show Work Please, I need to study it. Thanks you.
This is Civil Engineering
arrow_forward
In present manufacturing facilities,which is given more priority, either price, quality, or cycle time when considering design for manufacturing? Briefly explain your choice.
arrow_forward
i need ans within 8 minutes so quickly plz with draw happy emoji in the end my best wishes ton
arrow_forward
Pls do it correct and all parts I'll rate you so please
arrow_forward
Civil Engineering
Q1. Differentiate: (support with figure/expressions/example)
(i) Black box vs. white box model (ii) Positive and negative feedback (iii) Stochastic vs. Deterministic model
(iv) Automated vs. manual calibration
arrow_forward
For the first line of calculation: why VA+VD= 1/2xWxL
I think it should be VA+VD=-1/2xWxL according to sign convention
arrow_forward
Please give the solutions for these questions
3rd sem civil, Strength of materials
arrow_forward
48. It facilitates business development opportunities and a competitive marketplace through market
development, trade promotion, trade shows, domestic and international advocacy, and standards
development.
a. ISO
b. ANSI
c. ITU-T
d. TIA
arrow_forward
As a Civil Engineer, you are to design your own equipment or device. What is this equipment or device? What metals of metal alloys you would prefer to use on it and why?
arrow_forward
Read the small case study about the process design of Boeing's 777 aircraft:
Boeing brings its customers on board Arguably the most innovative new passenger aircraft to enter service over the last few years was the Boeing 777, a new twin-engined aircraft, in the 300-plus seats category to compete with established models from McDonnell and Airbus The existence of established competitor products is important. When Boeing developed the 747 'Jumbo' jet aircraft, it had no direct competitors. The company's customers either wanted the product or they didn't. Not so for the 777; Boeing knew that it must consider its customers' requirements.
The company had to take a new course to understand its customers' needs and then to transform that knowledge into an aircraft that could best meet those needs. Boeing has always maintained close involvement with its customers, but this project called for a new depth of listening and understanding Initially, eight large potential customers (including…
arrow_forward
4 ways metallurgy can help make roads better. (With references).
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Related Questions
- Recognize the different types of equipment used in the railroad industryarrow_forwardThe figure has h-30, why is that? What is the purpose and meaning of putting h-30?arrow_forwardSupport your answer for Road over the rail or rail over the Road ...by discussing advantages and disadvantages of each optionarrow_forward
- History of Autodesk AutoCADarrow_forwardFIND THE Vmax AND Mmax. ASAP THANK YOUarrow_forwardQuestion Seven (a) Name four important goals of materials selection? (b) Packaging material comes in different forms. Give two common packaging materials and explain four parameters that you would consider when selecting any of the two materials for packaging purposes. (c) Explain three properties and uses of wood as a construction material. Why is wood preferred to steel especially for erecting roof structures? (d) Using the materials optimisation loop triangle, briefly explain why school chairs are preferably made from wood.arrow_forward
- Engineering Management ,i need solutions in 10 minutes please. MCQ/For the activities in the table shown below. Use (A.O.A) method to find the critical path CP. A-ADMJN B-AEKN C-CFKN D-BEKN E-ADMIN F-ACFGN G-ADBEKN H-CFGNarrow_forwardList four ways knowledge in metallurgy can be used in road construction. Do not explain but add references.arrow_forwardI need a solution quickly, Use ACI Codearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Construction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage Learning
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning