C173/D278 Supplemental Resources
(Following Resources are the same for both C173 and D278)
Resources:
zyBooks is the main learning resource for this course. Each lesson in the zyBooks includes a variety of
challenge/participation/Lab activities.
See
C173/D278 14-Day Challenge Pacing Guide for pacing tips.
See C173/D278 Terminology Quiz_Questions_Answers.pdf to review the terminology covered in the
entire course.
Use these
Study Questions to see what to focus on.
See C173/D278_zyBooks_Lab_Solutions.pdf Schedule time with any C173/D278 CIs:
C173/D278 Course Instructor Information
See C173/D278 Audio Series Recordings
Recorded Short Webinars
:
(please note: current zyBooks version is v5, the videos were recorded on zyBooks v4, the activity numbers do
not match, but the content is the same)
Lesson 2 - Variables / Assignments: Participation Activity 2.1.1 (2.1.1: People on bus) (2 min), Challenge Activity 2.2.1 (2.2.1: Enter the output of the variable assignments) (4 min) Lesson 3 - Branches: Control Structures (branches, loops, ...) (24 min)
Cohort - Branches & Loops (Demonstration)
Lesson 4 - Loops: Participation Activity 4.1.6 (3.10.6: Counting negative values in a list of values) (2 min), Participation Activity 4.5.4 (3.14.4 Beyond iterating N times) (10 min), Participation Activity 4.7.2 (3.16.2: Nested loops: Inner loop execution) (9 min) Cohort - Branches & Loops (Demonstration)
Lesson 5 - Arrays:
Cohort - Introduction, Variable Assignments, Arrays
Lesson 6 - User-Defined Functions: Challenge Activity 6.2.1 (4.2.1: Enter the output of the returned value) (7 min) Cohort - Functions & Algorithms (Demonstration)
Lesson 7 - Algorithms: Algorithm Pseudocode example (3 min), Pre-Assessment item 34 on Algorithms (8min)
Rate This Article
(Average Rating: 3.02)
Show Properties
C173/D278 Supplemental Resources
ARTICLE LINK
ARTICLE LINK
BACK TO SEARCH
BACK TO SEARCH
5/6/24, 10:30 PM
srm--c.vf.force.com/apex/coursearticle?Id=kA03x000000spz1CAA
https://srm--c.vf.force.com/apex/coursearticle?Id=kA03x000000spz1CAA
1/2
Cohort - Functions & Algorithms (Demonstration)
Lesson 8 - The Design Process: Cohort - SDLC / UML ; Waterfall & Agile
UML and the Software Development Life Cycle (15 min)
Lesson 9 - Programming Languages: Cohort - Programming Languages (50 min) Programming Language Concepts (38 min) Recorded Long Webinars
:
NEW Lab Webinars below are a work in progress and use v5 of the zyBook Learning Resoruce.
Webinar - LAB Solution Walkthrough - Units 1 to 2.18 (56m)
Webinar - LAB Solution Walkthrough - Unit 2.19 to 2.20 (56m)
Webinar -
LAB Solution Walkthrough - Unit 3.12 (43m)
Webinar - LAB Solution Walkthrough - Unit 3.13 and 3.14 (58m)
Webinar -
LAB Solution Walkthrough - Unit 3.15 and 3.16 (56m)
Webinar - LAB Solution Walkthrough - Unit 4.12 and 4.13 (56m)
Webinar -
LAB Solution Walkthrough - Unit 4.14 and 4.15 (58m)
Webinar - LAB Solution Walkthrough - Unit 5.8 and 5.9 (53m)
Webinar - LAB Solution Walkthrough - Unit 5.10 and 6.8 (64m)
Webinar - LAB Solution Walkthrough - Unit 6.9 and 6.10 (45m)
Webinar - LAB Solution Walkthrough - Unit 6.11 and 6.12 (45m)
Webinar - LAB Solution Walkthrough - Unit 6.13 and 6.14 (40m)
Webinar - LAB Solution Walkthrough - Unit 6.15 and 6.18 (88m)
(please note: current zyBooks version is v5, the videos below were recorded using zyBooks v4, the activity
numbers do not match, but the content is the same)
C173/D278 Webinar - Lesson 2. Variables / Assignments (2.1 to 2.6) (53m)
C173/D278 Webinar - Lesson 2. Variables / Assignments (2.6 to 2.14) (57m)
C173/D278 Webinar - Lesson 5. Arrays and Lesson 3. Branches (2.15 to 3.2) (54m)
C173/D278 Webinar - Lesson 3. Branches (3.2 to 3.9) (54m)
C173/D278 Webinar - Lesson 4. Loops (3.9 to 3.15) (55m)
C173/D278 Webinar - Lesson 4. Loops (3.15 to 3.20) (51m)
C173/D278 Webinar - Lesson 6. User-Defined Functions (4.1 to 4.2) (54m)
C173/D278 Webinar - Lesson 6. User-Defined Functions (4.2 to 4.3) (61m)
C173/D278 Webinar - Lesson 6. User-Defined Functions (4.4 to 4.6) (58m)
C173/D278 Webinar - Lesson 7. Algorithms (5.1) (60m)
C173/D278 Webinar - Lesson 7. Algorithms (5.2 to 6.2) (55m)
C173/D278 Webinar - Lesson 8. The Design Process (7.1 to 7.2) (56m)
C173/D278 Webinar - Lesson 8. The Design Process (7.2 to 8.1) (53m)
C173/D278 Webinar - Lesson 9. Software Topics (8.1 to 8.3) (30m)
Others:
See
C173/D278 Supplemental Videos
Article Link:
https://srm--c.vf.force.com/apex/coursearticle?Id=kA03x000000spz1CAA
5/6/24, 10:30 PM
srm--c.vf.force.com/apex/coursearticle?Id=kA03x000000spz1CAA
https://srm--c.vf.force.com/apex/coursearticle?Id=kA03x000000spz1CAA
2/2
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
I ONLY NEED HELP WITH PART. (D) Please and thank you.
You may need to use the appropriate technology to answer this question.
Due to population growth in the area, the new Liberty High School has just opened in a local school district. The athletic director at Liberty High is planning the launch of the school's track and field team. The first team practice is scheduled for April 1. The activities, their immediate predecessors, and the activity time estimates (in weeks) are listed in the following table.
Time (Weeks)
Activity
Description
ImmediatePredecessor
Optimistic
Most Probable
Pessimistic
A
Meet with board
1
1
2
B
Hire coaches
A
4
6
8
C
Conduct fundraiser
A
2
4
6
D
Announce program
B, C
1
2
3
E
Meet with coaches
B
2
3
4
F
Order team equipment
A
1
2
3
G
Register athletes
D
1
2
3
H
Reserve buses for meets
G
1
2
3
I
Plan first practice
E, H, F
1
1
1
(a)
Draw a project network.
A project network with 11 activities and 13 directed arcs is…
arrow_forward
Required information
[The following information applies to the questions displayed below.]
The Air Force Museum Foundation has commissioned the purchase of 16 Four F Sixes, pre-World War II aircraft. They will
be built completely from scratch to the exact specifications used for the originals. As further authentication, the aircraft will
be made using the technology and manufacturing processes available when the originals were built. Each of the 16
airplanes will be flown to Air Force and aviation museums throughout the country for exhibition. Aviation enthusiasts can
also visit the production facility to see exactly how such aircraft were built in 1938.
Soren Industries wants to bid on the aircraft contract and asked for and received certain cost information about the Four F
Sixes from the Air Force. The information includes some of the old cost data from the builders of the original aircraft. The
available information is for the total accumulated time as the 1st, 8th, and 32nd…
arrow_forward
I need help with this practice problem for review
arrow_forward
What written materials should the supervisor provide for new letter carriers in light of what Carol Burgess already provides?
Carol Burgess is a letter carrier and a part-time trainer of letter carriers for the U.S. Postal Service in a major city on the west coast. She trains all new letter carriers in her service area, which encompasses the northern half of her state. Over the past five years she has trained 318 new letter carriers. Typically,the training is offered prior to the new letter carrier’s entry onto the job, although sometimes it occurs shortly thereafter.The training program typically encompasses both the orientation of new employees to the U.S. Postal Service and the development of specific skills needed by the new letter carrier. The latter involves practice in casing mail (i.e., sorting) to appropriate locations of a case in preparation for delivery,reading maps, determining appropriate sequencing of delivery, and customer relations. The total training program takes…
arrow_forward
Click to see additional instructions
What follows is a numeric fill in the blank question with 6 blanks.
Korle Bu Teaching hospital has a new dietician, Mrs. Abban who wishes to effect
some drastic changes to the meals given patients on admission at the hospital. Her
first objective is to change the breakfast menu to ensure a healthy breakfast diet for
patients. Specifically, Mrs. Abban wants to make a breakfast meal that will be high in
calories, calcium, protein, and fibre, which are especially essential to patients. In
addition, she also must ensure the breakfast meal is low in fat and cholesterol. Mrs.
Abban must also minimize the cost of making these meals. Based on her dearth of
knowledge in the field Mrs. Abban settles on the following possible meals she
believes will help her achieve her objectives. The individual nutrient contributions
and cost from which Mrs. Abban can develop a standard breakfast menu are shown in
the table below.
Breakfast
calorie
Fat
Cholester
Iron
Calciu…
arrow_forward
9:36
Assignment Details
Introduction to Business (BUSG-129-WJ1 CRN: 23348)
Description
After watching the following 4 UTube videos,
students are to discuss the keys points from
each of these 4 videos:
1. What is a stock market index?
2. Stocks, Bonds, Funds - What's the
difference?
3. What are dividends?
4. What is a 401K?
W
VES
Dashboard
56 ا...
Stock Market Index | by Wal...
3
CODIGO
T
View Discussion
000
000
Calendar
7
To Do
NA
Notifications
Inbox
arrow_forward
The difference between job enrichmem and job enlargement is that:a) enlarged jobs contain a larger number of similar tasks, while enriched jobs include some of the planning and control necessary for job accomplishment.b) enriched jobs contain a larger number of similar tasks, while enlarged jobs include some of the planning and control necessary for job accomplisllment.c) enriched jobs enable an employee to do a number of boring jobs instead of just one.d) all of the above.
arrow_forward
Instructions:
Do this on a clean sheet of paper (preferably bond paper).
Construct a complete Linear Programming Model.
Show a complete, legible, and well-organized solution.
Upload in Canvas an image or pdf file of your work through this page.
3. In order to produce 1000 tons of non-oxidizing steel for engine valves, at least the following units of manganese, chromium and molybdenum, will be needed weekly: 10 units of manganese, 12 units of chromium, and 14 units of molybdenum (1. unit is 10 pounds). These metals are obtainable from dealers in nonferrous metals, who, to attract markets make them available in cases of three sizes, S, M and L. One S case costs $9 and contains 2 units of manganese, 2 units of chromium and 1 unit of molybdenum. One M case costs $12 and contains 2 units of manganese, 3 units of chromium, and 1 unit of molybdenum. One L case costs $15 and contains 1 unit of manganese, 1 unit of chromium and 5 units of molybdenum. How many cases of each kind should be…
arrow_forward
Chuck is a newly promoted supervisor of a large call center. He is tasked by his manager to devise a customer service training and testing manual for new and existing workers.
How would he define customer service?
If Chuck were to write a training manual on CUSTOMER SERVICE what would that look like?
: Problem Solving
Definition
What role does problem solving have in customer service? What is effective problem solving? What problem solving strategies and techniques do professionals use?
How would one gain this knowledge and learn from this experience?
arrow_forward
Please see screenshot. I need the formulas to achieve this result, please.
arrow_forward
Here is a CPM network with activity times in weeks:
(A(7))
(B(5))
E(4))
(G(3)
(C(6))
(F(8))
(D(6))
arrow_forward
Situation: One other significant problem plagued the engineering departments at TRP. Because ofpast salary increase practices, there is now a high salary gap between the engineermanagement levels and the engineering designers. For the same long working hours, thoseworking in the operational levels (e.g., payroll, accounting, HR) made almost 15 times less thanthe engineering designers. These same operational level employees also made 25 times lessthan the engineering management groups.
Alternative Courses of Action for payment gap between workers with the same working hours: ?
Pros: ?
Cons: ?
arrow_forward
[The following information applies to the questions displayed below.]
The following are the car repair shop data:
TETE
Ticket No.
Work
Ticket No.
Work
Ticket No.
Work
1
Lube & oil
11
Battery
21
Battery
Tires
2
Lube & oil
12
Tires
22
3
Brakes
13
Brakes
23
Brakes
4
Lube & oil
14
Transmission
24
Transmission
Lube & oil
15
Brakes
25
Brakes
Tires
16
Battery
26
Lube & oil
7
Tires
17
Brakes
27
Lube & oil
8.
Brakes
18
Tires
28
Lube & oil
9.
Brakes
19
Tires
29
Tires
10
Lube & oil
20
Lube & oil
30
Lube & oil
arrow_forward
Suraj is currently employed as a healthcare provider in a community hospital in a local community. The local high school is designing a learning unit for sophomores who have expressed an interest in healthcare analytics as a potential future career. State at least 2 certifications or professional associations that are relevant to this field and the pros and cons of obtaining these certifications or becoming a member of these association.
Need answer fast plz
arrow_forward
please help answer part a and b for question 1. Please answer question 2 as well.
arrow_forward
Exercise 8-37, 8-38, 8-39 & 8-40 (Static) (LO 8-2, 3, 5)
Skip to question
[The following information applies to the questions displayed below.]Pacific Ink had beginning work-in-process inventory of $744,960 on October 1. Of this amount, $304,920 was the cost of direct materials and $440,040 was the cost of conversion. The 48,000 units in the beginning inventory were 30 percent complete with respect to both direct materials and conversion costs.
During October, 102,000 units were transferred out and 30,000 remained in ending inventory. The units in ending inventory were 80 percent complete with respect to direct materials and 40 percent complete with respect to conversion costs. Costs incurred during the period amounted to $2,343,600 for direct materials and $3,027,840 for conversion.
Exercise 8-37 (Static) Compute Costs per Equivalent Unit: Weighted-Average Method (LO 8-3)
Required:
a. Compute the equivalent units for the materials and conversion cost calculations.
b.…
arrow_forward
ABC Solutions is a traditional company in textile industrywith a combined workforce of 150 staff. Due to increased levels of competition, this company is now increasingly finding it difficult to compete – especially as the larger companies seem to be a little more innovative, agile and responsive to client requirements. Management have noticed that staff, especially the highly skilled ones, are now leaving the company to seek work elsewhere (in these larger companies). This has meant appointing new staff and undertaking a considerable amount of re-training to replace those that have left the company. Apart from impacting on core business operations, ABC Solutions has started witnessing a drop in its profit margin.
Given this position, senior management at ABC Solutions have decided to implement a performance measurement tool (PMT) that would allow them to align the strategic, management and operational requirements of the business. They are therefore considering the adoption of the…
arrow_forward
How to develop an LP spreadsheet model that relates five-day shift schedules to daily numbers of employees available?
arrow_forward
More in-depth data management and cleaning can be done by Tableau Desktop.
Group of answer choices
True
False
arrow_forward
Driving License Issue Department wants to computerize the Driving License system by taking it online, which will stop the manual system of a trainer and trainee in getting a driving license. Based on SWOT analysis match the concepts with the provided Driving License system scenario in the table.
a.
Easy to communicate among trainer, trainee and police -
b.
Trainers may lose their customers –
c.
Trainers and trainees are unaware of technology to use -
d.
Unified driving license –
arrow_forward
EX6-11 (Algo) A large Southeast city is requesting federal...
A large Southeast city is requesting federal funding for a park-and-ride project. One of the requirements in the request application is a
network plan for the design phase of the project. Sophie Kim, the chief engineer, wants you to develop a project network plan to meet
this requirement. She has gathered the activity time estimates and their dependencies shown here.
10 Description
A
B
Survey
Soils report
C Traffic design
0
Lot layout.
Approve design
E
F 111umination
G Drainage
H Landscape
I
Signage
3 Bid proposal
The project is expected to take
The critical path is
Early start for Activity E is:
Late finish for Activity F is:
Slack for Activity Cis:
Predecessor
None
A
A
A
B, C, D.
E
E
E
t
F. G, H, 1
Time
(days)
11
18.
15
7
85
25
18
23
15
8
days.
day(s)
arrow_forward
Homework help starts here!
ASK AN EXPERT
CHAT
MATH SOLVER
Question
Question
A business is launching a new product. The launch will require a number of related activities as follows - hire a sales manager (5 weeks), require the sales manager to recruit sales people (4 weeks), train the sales people (7 weeks), select an advertising agency (2 weeks), plan an advertising campaign with the agency (4 weeks), conduct the advertising campaign (10 weeks), design the packaging of the product (4 weeks), set up packing operation (12 weeks), pack enough products for the launch stock (8 weeks), order the launch quantity of products from the manufacturer (13 weeks), select distributors for the product (9 weeks), take initial orders from the distributors (3 weeks), dispatch the initial orders to the distributors (2 weeks). (a) If the sales manager cannot be hired for 3 weeks, how will that affect the total project? (b) If the whole project launch operation is to be…
arrow_forward
ABC Solutions is a traditional company in a textile industry with a combined workforce of 150 staff. Due to increased levels of competition, this company is now increasingly finding it difficult to compete – especially as the larger companies seem to be a little more innovative, agile and responsive to client requirements. Management have noticed that staff, especially the highly skilled ones, are now leaving the company to seek work elsewhere (in these larger companies). This has meant appointing new staff and undertaking a considerable amount of re-training to replace those that have left the company. Apart from impacting on core business operations, ABC Solutions has started witnessing a drop in its profit margin.
Given this position, senior management at ABC Solutions have decided to implement a performance measurement tool (PMT) that would allow them to align the strategic, management and operational requirements of the business. They are therefore considering the adoption of the…
arrow_forward
An electrical contractor's records during the last five weeks indicate the number of job requests:
Week:
1
2
3
4
5
Requests:
25
27
25
26
27
Click here for the Excel Data File
Predict the number of requests for week 6 using each of these methods:
arrow_forward
What are Gantt charts? How are they used in scheduling? What are the advantages of using Ganttcharts?
arrow_forward
A customer places an order on January 1, 2019. Ten days later, that order is received by the manufacturing department. Fifteen days later, the order is put into production. Processing (manufacturing) time is 20 days for this order. The completed order is then shipped 10 days later. For thisorder, what was the total customer-response time (CRT), in days? (Hint: Refer to Exhibit 14.14 andaccompanying discussion.)
arrow_forward
A Gantt chart ________.
Group of answer choices
Graphs bottleneck durations
Illustrates the order and duration of project tasks
Lists all ongoing projects
None of these answers
arrow_forward
Experiment1: application of excel 2010 (if you have EXCEL installed on your computer)
Requirement: create a pivot table and chart in excel
1. pivot table
(1) basic data
Please paste the table header and 1-2 rows of the data, and explain the meaning of the data.
(2) pivot table
Please paste the pivot table here.
(3) function of this pivot table
Please explain the pivot table that you have created, what is the function of the result.
2. chart
(1) basic data
As above
(2) chart
Please paste the chart here, and tell me which type of chart you have used.
(3) function of this chart
Please explain the chart that you have created, what is the function of the result.
its management information system lab
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Related Questions
- I ONLY NEED HELP WITH PART. (D) Please and thank you. You may need to use the appropriate technology to answer this question. Due to population growth in the area, the new Liberty High School has just opened in a local school district. The athletic director at Liberty High is planning the launch of the school's track and field team. The first team practice is scheduled for April 1. The activities, their immediate predecessors, and the activity time estimates (in weeks) are listed in the following table. Time (Weeks) Activity Description ImmediatePredecessor Optimistic Most Probable Pessimistic A Meet with board 1 1 2 B Hire coaches A 4 6 8 C Conduct fundraiser A 2 4 6 D Announce program B, C 1 2 3 E Meet with coaches B 2 3 4 F Order team equipment A 1 2 3 G Register athletes D 1 2 3 H Reserve buses for meets G 1 2 3 I Plan first practice E, H, F 1 1 1 (a) Draw a project network. A project network with 11 activities and 13 directed arcs is…arrow_forwardRequired information [The following information applies to the questions displayed below.] The Air Force Museum Foundation has commissioned the purchase of 16 Four F Sixes, pre-World War II aircraft. They will be built completely from scratch to the exact specifications used for the originals. As further authentication, the aircraft will be made using the technology and manufacturing processes available when the originals were built. Each of the 16 airplanes will be flown to Air Force and aviation museums throughout the country for exhibition. Aviation enthusiasts can also visit the production facility to see exactly how such aircraft were built in 1938. Soren Industries wants to bid on the aircraft contract and asked for and received certain cost information about the Four F Sixes from the Air Force. The information includes some of the old cost data from the builders of the original aircraft. The available information is for the total accumulated time as the 1st, 8th, and 32nd…arrow_forwardI need help with this practice problem for reviewarrow_forward
- What written materials should the supervisor provide for new letter carriers in light of what Carol Burgess already provides? Carol Burgess is a letter carrier and a part-time trainer of letter carriers for the U.S. Postal Service in a major city on the west coast. She trains all new letter carriers in her service area, which encompasses the northern half of her state. Over the past five years she has trained 318 new letter carriers. Typically,the training is offered prior to the new letter carrier’s entry onto the job, although sometimes it occurs shortly thereafter.The training program typically encompasses both the orientation of new employees to the U.S. Postal Service and the development of specific skills needed by the new letter carrier. The latter involves practice in casing mail (i.e., sorting) to appropriate locations of a case in preparation for delivery,reading maps, determining appropriate sequencing of delivery, and customer relations. The total training program takes…arrow_forwardClick to see additional instructions What follows is a numeric fill in the blank question with 6 blanks. Korle Bu Teaching hospital has a new dietician, Mrs. Abban who wishes to effect some drastic changes to the meals given patients on admission at the hospital. Her first objective is to change the breakfast menu to ensure a healthy breakfast diet for patients. Specifically, Mrs. Abban wants to make a breakfast meal that will be high in calories, calcium, protein, and fibre, which are especially essential to patients. In addition, she also must ensure the breakfast meal is low in fat and cholesterol. Mrs. Abban must also minimize the cost of making these meals. Based on her dearth of knowledge in the field Mrs. Abban settles on the following possible meals she believes will help her achieve her objectives. The individual nutrient contributions and cost from which Mrs. Abban can develop a standard breakfast menu are shown in the table below. Breakfast calorie Fat Cholester Iron Calciu…arrow_forward9:36 Assignment Details Introduction to Business (BUSG-129-WJ1 CRN: 23348) Description After watching the following 4 UTube videos, students are to discuss the keys points from each of these 4 videos: 1. What is a stock market index? 2. Stocks, Bonds, Funds - What's the difference? 3. What are dividends? 4. What is a 401K? W VES Dashboard 56 ا... Stock Market Index | by Wal... 3 CODIGO T View Discussion 000 000 Calendar 7 To Do NA Notifications Inboxarrow_forward
- The difference between job enrichmem and job enlargement is that:a) enlarged jobs contain a larger number of similar tasks, while enriched jobs include some of the planning and control necessary for job accomplishment.b) enriched jobs contain a larger number of similar tasks, while enlarged jobs include some of the planning and control necessary for job accomplisllment.c) enriched jobs enable an employee to do a number of boring jobs instead of just one.d) all of the above.arrow_forwardInstructions: Do this on a clean sheet of paper (preferably bond paper). Construct a complete Linear Programming Model. Show a complete, legible, and well-organized solution. Upload in Canvas an image or pdf file of your work through this page. 3. In order to produce 1000 tons of non-oxidizing steel for engine valves, at least the following units of manganese, chromium and molybdenum, will be needed weekly: 10 units of manganese, 12 units of chromium, and 14 units of molybdenum (1. unit is 10 pounds). These metals are obtainable from dealers in nonferrous metals, who, to attract markets make them available in cases of three sizes, S, M and L. One S case costs $9 and contains 2 units of manganese, 2 units of chromium and 1 unit of molybdenum. One M case costs $12 and contains 2 units of manganese, 3 units of chromium, and 1 unit of molybdenum. One L case costs $15 and contains 1 unit of manganese, 1 unit of chromium and 5 units of molybdenum. How many cases of each kind should be…arrow_forwardChuck is a newly promoted supervisor of a large call center. He is tasked by his manager to devise a customer service training and testing manual for new and existing workers. How would he define customer service? If Chuck were to write a training manual on CUSTOMER SERVICE what would that look like? : Problem Solving Definition What role does problem solving have in customer service? What is effective problem solving? What problem solving strategies and techniques do professionals use? How would one gain this knowledge and learn from this experience?arrow_forward
- Please see screenshot. I need the formulas to achieve this result, please.arrow_forwardHere is a CPM network with activity times in weeks: (A(7)) (B(5)) E(4)) (G(3) (C(6)) (F(8)) (D(6))arrow_forwardSituation: One other significant problem plagued the engineering departments at TRP. Because ofpast salary increase practices, there is now a high salary gap between the engineermanagement levels and the engineering designers. For the same long working hours, thoseworking in the operational levels (e.g., payroll, accounting, HR) made almost 15 times less thanthe engineering designers. These same operational level employees also made 25 times lessthan the engineering management groups. Alternative Courses of Action for payment gap between workers with the same working hours: ? Pros: ? Cons: ?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,